Determining optimal risk assessment model in construction projects (Case study: steel plant construction project

Saghar Salajegheh, A. Akhavan, َAlireza Hajihosseini
{"title":"Determining optimal risk assessment model in construction projects (Case study: steel plant construction project","authors":"Saghar Salajegheh, A. Akhavan, َAlireza Hajihosseini","doi":"10.18502/tkj.v12i1.3656","DOIUrl":null,"url":null,"abstract":"Introduction: Identifying occupational hazards and managing occupational safety and health risks has been the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. The aim of the present study was to determine the optimal risk assessment methodology in development projects. \nMaterials and Methods: This was a descriptive-analytic research In this research, using previous research studies and collecting expert opinions, the most important criteria for selecting a specific risk assessment methodology, and then using one of the three most-used techniques is an important activity in the steel making industry and risk assessment. Then, the decision matrix is based on the strengths and weaknesses of the models. The prioritization of these three methods is done using the hierarchical analysis decision method. \nResults: In this paper, five key factors, the degree of application in identifying hazards, usability in different stages of risk assessment, reliability, ease of use, and training needs and costs, are identified as the most important criteria for choosing a risk assessment technique and the FMEA method was considered as the best  Risk Assessment Method. \nConclusion: FMEA methodhas been introduced with regard to its capabilities as an optimal risk assessment method for contruction projects.","PeriodicalId":340583,"journal":{"name":"Occupational Medicine Quarterly Journal","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Occupational Medicine Quarterly Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18502/tkj.v12i1.3656","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Introduction: Identifying occupational hazards and managing occupational safety and health risks has been the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. The aim of the present study was to determine the optimal risk assessment methodology in development projects. Materials and Methods: This was a descriptive-analytic research In this research, using previous research studies and collecting expert opinions, the most important criteria for selecting a specific risk assessment methodology, and then using one of the three most-used techniques is an important activity in the steel making industry and risk assessment. Then, the decision matrix is based on the strengths and weaknesses of the models. The prioritization of these three methods is done using the hierarchical analysis decision method. Results: In this paper, five key factors, the degree of application in identifying hazards, usability in different stages of risk assessment, reliability, ease of use, and training needs and costs, are identified as the most important criteria for choosing a risk assessment technique and the FMEA method was considered as the best  Risk Assessment Method. Conclusion: FMEA methodhas been introduced with regard to its capabilities as an optimal risk assessment method for contruction projects.
建设项目风险评估优化模型的确定(以钢铁厂建设项目为例)
引言:识别职业危害,管理职业安全健康风险是组织健康安全管理体系最重要的使命和责任,采用编码计划实现这一目标是持续改进和推广健康安全管理体系的关键。本研究的目的是确定开发项目的最佳风险评估方法。材料和方法:这是一个描述性分析研究在本研究中,利用以往的研究研究和收集专家意见,选择一个具体的风险评估方法的最重要的标准,然后使用三种最常用的技术之一是钢铁行业和风险评估的重要活动。然后,根据模型的优缺点构建决策矩阵。采用层次分析法对三种方法的优先级进行排序。结果:本文确定了风险评估技术选择的最重要标准是风险识别的应用程度、风险评估不同阶段的可用性、可靠性、易用性、培训需求和成本五个关键因素,并认为FMEA方法是最佳风险评估方法。结论:FMEA方法作为一种最优的建设项目风险评价方法,具有一定的应用价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信