Robustness Analysis for Scheduling Problems Using the Inverse Method

L. Fribourg, R. Soulat, D. Lesens, P. Moro
{"title":"Robustness Analysis for Scheduling Problems Using the Inverse Method","authors":"L. Fribourg, R. Soulat, D. Lesens, P. Moro","doi":"10.1109/TIME.2012.10","DOIUrl":null,"url":null,"abstract":"Given a Parametric Timed Automaton (PTA) A and a reference valuation for timings, the Inverse Method (IM) synthesizes a constraint around the reference valuation where A behaves in the same time-abstract manner. This provides us with a quantitative measure of robustness of the behavior of A around the reference valuation. We show in this paper how IM can be applied in a specific way to treat the robustness of scheduling systems. We also explain how to use the method in order to synthesize large zones of the timing parameter space where the system is guaranteed to be schedulable. We illustrate the method on several examples of the literature as well as a case study originating from an industrial design project.","PeriodicalId":137826,"journal":{"name":"2012 19th International Symposium on Temporal Representation and Reasoning","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-09-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 19th International Symposium on Temporal Representation and Reasoning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TIME.2012.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27

Abstract

Given a Parametric Timed Automaton (PTA) A and a reference valuation for timings, the Inverse Method (IM) synthesizes a constraint around the reference valuation where A behaves in the same time-abstract manner. This provides us with a quantitative measure of robustness of the behavior of A around the reference valuation. We show in this paper how IM can be applied in a specific way to treat the robustness of scheduling systems. We also explain how to use the method in order to synthesize large zones of the timing parameter space where the system is guaranteed to be schedulable. We illustrate the method on several examples of the literature as well as a case study originating from an industrial design project.
基于逆方法的调度问题鲁棒性分析
给定参数时间自动机(PTA) a和时间的参考估值,逆方法(IM)综合了参考估值周围的约束,其中a以相同的时间抽象方式表现。这为我们提供了a围绕参考估值行为的稳健性的定量度量。在本文中,我们展示了如何以一种特定的方式应用IM来处理调度系统的鲁棒性。我们还解释了如何使用该方法来合成保证系统可调度的定时参数空间的大区域。我们用文献中的几个例子以及一个源自工业设计项目的案例研究来说明这种方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信