KAJIAN TEKNIS PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN BATUBARA

Muhammad Dafa Ramadhan
{"title":"KAJIAN TEKNIS PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN BATUBARA","authors":"Muhammad Dafa Ramadhan","doi":"10.36986/impj.v5i1.56","DOIUrl":null,"url":null,"abstract":"        This research aims to calculate the production capability of loading and conveyance equipment used in coal mining activities, find out what factors affect the non-achievement of coal production suggestions, and then make efforts to increase the production of loading and conveyance equipment so that the targets that have been set can be achieved. . In this study, observation and retrieval of data in the field directly (primary data) and indirectly (secondary data) will then be carried out data processing. Based on the results of calculations, it can be concluded that the production of Komatsu PC400LC Excavator loading equipment is 18,651.11 Tons / month and the production of 4 units of Nissan CWB450HD Dump Truck conveyance is 18.325,66 Tons / month. Factors that cause non-achievement of production targets on loading equipment and conveyance are low work efficiency due to loss of working time and non-optimal distribution time due to road conditions that do not meet the standards. Efforts to increase the production of load tools were made by increasing work efficiency from 63.56% to 64.32%, so that the production target increased to 20,761.54 tons / month. For conveyance, the first alternative that can be done to increase production is to increase work efficiency from 63.34% to 64.10% and optimize the distribution time of conveyance from 359.77 seconds to 330.10 seconds, so that production increases to 20.212,45 Tons / month. The second alternative that can be done is to increase the work efficiency and increase the number of bucket fillings from 3 times to 4 times, so that production increases to 21.986,50 Tons / month.","PeriodicalId":239963,"journal":{"name":"Indonesian Mining Professionals Journal","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indonesian Mining Professionals Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36986/impj.v5i1.56","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

        This research aims to calculate the production capability of loading and conveyance equipment used in coal mining activities, find out what factors affect the non-achievement of coal production suggestions, and then make efforts to increase the production of loading and conveyance equipment so that the targets that have been set can be achieved. . In this study, observation and retrieval of data in the field directly (primary data) and indirectly (secondary data) will then be carried out data processing. Based on the results of calculations, it can be concluded that the production of Komatsu PC400LC Excavator loading equipment is 18,651.11 Tons / month and the production of 4 units of Nissan CWB450HD Dump Truck conveyance is 18.325,66 Tons / month. Factors that cause non-achievement of production targets on loading equipment and conveyance are low work efficiency due to loss of working time and non-optimal distribution time due to road conditions that do not meet the standards. Efforts to increase the production of load tools were made by increasing work efficiency from 63.56% to 64.32%, so that the production target increased to 20,761.54 tons / month. For conveyance, the first alternative that can be done to increase production is to increase work efficiency from 63.34% to 64.10% and optimize the distribution time of conveyance from 359.77 seconds to 330.10 seconds, so that production increases to 20.212,45 Tons / month. The second alternative that can be done is to increase the work efficiency and increase the number of bucket fillings from 3 times to 4 times, so that production increases to 21.986,50 Tons / month.
从技术上讲,在煤矿开采过程中生产货物和运输工具
本研究旨在计算煤矿开采活动中使用的装运设备的生产能力,找出影响煤炭生产建议未实现的因素,进而努力提高装运设备的产量,使已设定的目标得以实现。在本研究中,将直接(一手数据)和间接(二次数据)实地观测和检索数据,然后进行数据处理。根据计算结果,可以得出小松PC400LC挖掘机装载设备的产量为18651.11吨/月,日产CWB450HD自卸卡车4台输送设备的产量为18.325 66吨/月。导致装载设备和运输设备无法完成生产目标的因素有:由于工作时间损失导致的工作效率低;由于道路条件不符合标准导致的配送时间不优化。努力提高负载工具的产量,将工作效率从63.56%提高到64.32%,使生产目标提高到20761.54吨/月。对于输送而言,提高产量的第一选择是将作业效率从63.34%提高到64.10%,并将输送分配时间从359.77秒优化到330.10秒,从而将产量提高到20.212,45吨/月。第二个可以做的选择是提高工作效率,将桶填充次数从3次增加到4次,使产量增加到21.98650吨/月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信