{"title":"Availability Study of a Longwall Shearer Including Phases of its Operation","authors":"Jarosław Brodny, Estera Brzana","doi":"10.2478/mape-2021-0018","DOIUrl":null,"url":null,"abstract":"Abstract The mining production process includes a number of sub-processes, the most important of which is mining the rock mass. In this process, increasingly modern mining machines are being used to replace human labor and to achieve high productivity. Full utilization of the potential of these machines is of great importance for the efficiency of individual stages and the whole process of mining production. In the process of mining the rock mass, the use of machinery of a mechanized longwall system is of fundamental significance. Their availability, efficiency and reliability significantly affect the efficiency of the whole mining production process. The paper refers to the availability of a longwall shearer as the basic machine of a mechanized mining system. Based on the analysis of diagnostic signals, recorded by the industrial automation system, the availability of the longwall shearer was determined for 10 selected cycles of its operation. The analysis also included the phases of these cycles, treated as separate periods of the shearer’s work. This division is a consequence of a great difference in the character of the shearer’s work in particular phases of the operating cycle. The analysis covered the phases of cutting, mining and shunting. The determined temporal waveforms and the shearer’s availability in these phases show their great diversity. Therefore, the results indicated the necessity to analyze the operation of mining machines in their characteristic periods, which can be the basis for minimizing unplanned interruptions in their operation and improving the efficiency of their use.","PeriodicalId":281768,"journal":{"name":"Multidisciplinary Aspects of Production Engineering","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Multidisciplinary Aspects of Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mape-2021-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract The mining production process includes a number of sub-processes, the most important of which is mining the rock mass. In this process, increasingly modern mining machines are being used to replace human labor and to achieve high productivity. Full utilization of the potential of these machines is of great importance for the efficiency of individual stages and the whole process of mining production. In the process of mining the rock mass, the use of machinery of a mechanized longwall system is of fundamental significance. Their availability, efficiency and reliability significantly affect the efficiency of the whole mining production process. The paper refers to the availability of a longwall shearer as the basic machine of a mechanized mining system. Based on the analysis of diagnostic signals, recorded by the industrial automation system, the availability of the longwall shearer was determined for 10 selected cycles of its operation. The analysis also included the phases of these cycles, treated as separate periods of the shearer’s work. This division is a consequence of a great difference in the character of the shearer’s work in particular phases of the operating cycle. The analysis covered the phases of cutting, mining and shunting. The determined temporal waveforms and the shearer’s availability in these phases show their great diversity. Therefore, the results indicated the necessity to analyze the operation of mining machines in their characteristic periods, which can be the basis for minimizing unplanned interruptions in their operation and improving the efficiency of their use.
长壁采煤机的可行性研究,包括其运行阶段
采矿生产过程包括许多子过程,其中最重要的是开采岩体。在这个过程中,越来越多的现代采矿机器被用来取代人力,实现高生产率。充分利用这些机器的潜力,对于提高采矿生产的各个阶段和整个过程的效率具有重要意义。在岩体开采过程中,机械化长壁系统的机械使用具有基础性的意义。它们的可用性、效率和可靠性显著影响着整个采矿生产过程的效率。本文论述了长壁采煤机作为机械化采矿系统基本机械的可行性。根据对工业自动化系统记录的诊断信号的分析,确定了长壁采煤机在10个选定的运行周期内的可用性。分析还包括这些循环的阶段,被视为采煤机工作的单独时期。这种划分是采煤机在操作周期的特定阶段的工作性质的巨大差异的结果。分析涵盖了切割、开采和分流三个阶段。确定的时间波形和采煤机在这些阶段的可用性表现出很大的多样性。因此,研究结果表明,有必要对矿机在其特征时段的运行进行分析,以最大限度地减少矿机运行中的意外中断,提高矿机的使用效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信