Usama H. Issa, Khaled Gamal Marouf, Hamdy B. Faheem
{"title":"Responsibility and Allocation for Risks Affecting Road’s Construction","authors":"Usama H. Issa, Khaled Gamal Marouf, Hamdy B. Faheem","doi":"10.21608/bfemu.2022.150630.1289","DOIUrl":null,"url":null,"abstract":"— In many cases, due to the absence of risk allocation models, the owner tended to convey all risks to the contractor who attempted to transfer them to the suppliers and subcontractors. Such attitude is causing a series of conflicts and disputes which will eventually influence the success of the","PeriodicalId":179458,"journal":{"name":"MEJ. Mansoura Engineering Journal","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"MEJ. Mansoura Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21608/bfemu.2022.150630.1289","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
— In many cases, due to the absence of risk allocation models, the owner tended to convey all risks to the contractor who attempted to transfer them to the suppliers and subcontractors. Such attitude is causing a series of conflicts and disputes which will eventually influence the success of the