The Impact of Overheads Variation on Time-Cost Optimisation of Building Infrastructure Projects

D. Kantianis
{"title":"The Impact of Overheads Variation on Time-Cost Optimisation of Building Infrastructure Projects","authors":"D. Kantianis","doi":"10.18485/epmj.2020.10.2.3","DOIUrl":null,"url":null,"abstract":"Received:23 November 2020 Revised: 16 December 2020 Accepted: 28 December 2020 Abstract: The research aims at investigating the impact of indirect expenses (overheads) variation on time-cost optimisation (TCO) of building infrastructure projects. The study’s main objectives are to propose a practical methodology for time-cost planning of buildings and to analyse the relationship between level of overheads and minimum project duration with respect to contractor’s profitability. The methodology entails the development of a TCO linear programming (LP) model founded on PERT/CPM network analysis, and its subsequent implementation to an actual public building project a three-storey nursery school for a municipality for the assessment of minimum project duration for a given gross profit when altering the fixed amount of overheads. The LP mathematical model is solved with Solver optimisation add-in for Microsoft Excel. Useful prototype minimum project duration vs. project overheads trade-off curves are derived to support project management decisions. The proposed TCO approach may serve as a valuable scheduling tool, providing stakeholders important insight into the relationship between level of project overheads, profit and duration. The study is expected to assist both construction researchers and practitioners towards more effective decisionmaking in the planning process of building projects.","PeriodicalId":371624,"journal":{"name":"European Project Management Journal","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Project Management Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18485/epmj.2020.10.2.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Received:23 November 2020 Revised: 16 December 2020 Accepted: 28 December 2020 Abstract: The research aims at investigating the impact of indirect expenses (overheads) variation on time-cost optimisation (TCO) of building infrastructure projects. The study’s main objectives are to propose a practical methodology for time-cost planning of buildings and to analyse the relationship between level of overheads and minimum project duration with respect to contractor’s profitability. The methodology entails the development of a TCO linear programming (LP) model founded on PERT/CPM network analysis, and its subsequent implementation to an actual public building project a three-storey nursery school for a municipality for the assessment of minimum project duration for a given gross profit when altering the fixed amount of overheads. The LP mathematical model is solved with Solver optimisation add-in for Microsoft Excel. Useful prototype minimum project duration vs. project overheads trade-off curves are derived to support project management decisions. The proposed TCO approach may serve as a valuable scheduling tool, providing stakeholders important insight into the relationship between level of project overheads, profit and duration. The study is expected to assist both construction researchers and practitioners towards more effective decisionmaking in the planning process of building projects.
管理费用变动对建筑基础设施项目时间成本优化的影响
摘要:本研究旨在探讨间接费用(间接费用)变化对建筑基础设施项目时间成本优化(TCO)的影响。这项研究的主要目的是为建筑物的时间成本规划提出一种实用的方法,并就承包商的盈利能力分析间接费用水平和最短项目工期之间的关系。该方法需要开发基于PERT/CPM网络分析的TCO线性规划(LP)模型,并将其随后实施到实际的公共建筑项目中,该项目是市政当局的三层幼儿园,用于评估在改变固定费用时给定毛利润的最短项目持续时间。利用Microsoft Excel的Solver优化插件对LP数学模型进行求解。推导出有用的原型,最短项目持续时间与项目开销的权衡曲线,以支持项目管理决策。建议的TCO方法可以作为一种有价值的调度工具,为利益相关者提供关于项目管理费用水平、利润和持续时间之间关系的重要见解。预计这项研究将有助于建筑研究人员和从业人员在建筑项目的规划过程中更有效地做出决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信