PERENCANAAN PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS ISLAM INTERNASIONAL INDONESIA DEPOK

A. Samudra, Suhariyanto Suhariyanto, Susapto Susapto
{"title":"PERENCANAAN PROYEK PEMBANGUNAN GEDUNG PERPUSTAKAAN UNIVERSITAS ISLAM INTERNASIONAL INDONESIA DEPOK","authors":"A. Samudra, Suhariyanto Suhariyanto, Susapto Susapto","doi":"10.55404/jos-mrk.2021.02.03.256-260","DOIUrl":null,"url":null,"abstract":"The Indonesian International Islamic University Depok Library Building Construction Project has area of 16495 m2. This library has 8 floors, which is located in the middle of the city. So, the mobilization of tools and materials become easier. The purpose of this study is to make project planning in terms of organizational structure, site layout, traffic management, strategy and implementation methods, quality, safety, occupational health and environment (K3L); Project Implementation Budget Plan and project scheduling. The data used are shop drawings, Work Plan and Conditions, and HSD Depok City 2020. Planning a project schedule using the Barchart method with the help of MS. Project 2016. This planning produces a line type organizational structure where the leaders and subordinates are in one line of command; Site Layout by using 1 unit tower crane; Traffic Management planning using a one gate system; The implementation strategy uses 2 zones; The implementation method uses Bottom Up, starting from zone 1 then proceed to zone 2 until the 8th floor; Quality plan based on the application of SOP (Standard Operating Procedure); The HSE plan includes hazard identification, an HSE equipment plan, and an HSE implementation schedule; The project duration plan is 43 weeks, and the Implementation Budget Plan is Rp. 151,141,347,875.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.256-260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Indonesian International Islamic University Depok Library Building Construction Project has area of 16495 m2. This library has 8 floors, which is located in the middle of the city. So, the mobilization of tools and materials become easier. The purpose of this study is to make project planning in terms of organizational structure, site layout, traffic management, strategy and implementation methods, quality, safety, occupational health and environment (K3L); Project Implementation Budget Plan and project scheduling. The data used are shop drawings, Work Plan and Conditions, and HSD Depok City 2020. Planning a project schedule using the Barchart method with the help of MS. Project 2016. This planning produces a line type organizational structure where the leaders and subordinates are in one line of command; Site Layout by using 1 unit tower crane; Traffic Management planning using a one gate system; The implementation strategy uses 2 zones; The implementation method uses Bottom Up, starting from zone 1 then proceed to zone 2 until the 8th floor; Quality plan based on the application of SOP (Standard Operating Procedure); The HSE plan includes hazard identification, an HSE equipment plan, and an HSE implementation schedule; The project duration plan is 43 weeks, and the Implementation Budget Plan is Rp. 151,141,347,875.
印尼国际伊斯兰大学图书馆建设项目规划
印尼国际伊斯兰大学德波克图书馆大楼建设项目,建筑面积16495平方米。这座图书馆有8层,位于城市的中心。因此,工具和材料的动员变得更加容易。本研究的目的是在组织结构、场地布局、交通管理、策略和实施方法、质量、安全、职业健康和环境(K3L)方面进行项目规划;项目实施预算计划和项目进度安排。使用的数据是车间图纸,工作计划和条件,以及HSD Depok City 2020。在ms project 2016的帮助下,使用Barchart方法规划项目进度。这种规划产生了一种直线型的组织结构,在这种结构中,领导和下属处于同一指挥线;采用1台塔吊进行现场布置;使用一门系统的交通管理规划;实施策略使用2个区域;实施方法为自下而上,从1区开始,再到2区,直到8楼;基于SOP(标准操作程序)的质量计划;HSE计划包括危害识别、HSE设备计划和HSE实施时间表;项目持续时间计划为43周,执行预算计划为151,141,347,875卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信