V. Livchits, I. Mironova, T. Tischenko, M. Frolova, A. Shvetsov
{"title":"Risk Accounting in Calculations of Public Efficiency of Large-scale Infrastructure Projects","authors":"V. Livchits, I. Mironova, T. Tischenko, M. Frolova, A. Shvetsov","doi":"10.1109/mlsd52249.2021.9600112","DOIUrl":null,"url":null,"abstract":"The article introduces the concept of a socially significant investment project, and examines special features of the “risk” concept in relation to such projects. A method is proposed for taking into account the risk of large-scale projects for the development of network transport infrastructure, based on analysis and assessment of each specific risk of a unique socially significant project. The foreign practice of evaluating megaprojects' efficiency is analyzed, from the point of taking into account uncertainty and risks, as well.","PeriodicalId":428017,"journal":{"name":"2021 14th International Conference Management of large-scale system development (MLSD)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 14th International Conference Management of large-scale system development (MLSD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/mlsd52249.2021.9600112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
The article introduces the concept of a socially significant investment project, and examines special features of the “risk” concept in relation to such projects. A method is proposed for taking into account the risk of large-scale projects for the development of network transport infrastructure, based on analysis and assessment of each specific risk of a unique socially significant project. The foreign practice of evaluating megaprojects' efficiency is analyzed, from the point of taking into account uncertainty and risks, as well.