Design aspects of the Chinese 500 kV thyristor controlled series compensation scheme TCSC Tian Guang

L. Kirschner, Peng Baoshu, Gong Tian Sen, W. Breuer
{"title":"Design aspects of the Chinese 500 kV thyristor controlled series compensation scheme TCSC Tian Guang","authors":"L. Kirschner, Peng Baoshu, Gong Tian Sen, W. Breuer","doi":"10.1109/DRPT.2004.1338501","DOIUrl":null,"url":null,"abstract":"In the late summer of 2002 the Tian Guang series compensation scheme located in the Tianshengqiao-Guangdong 550 kV ac-network has been ordered by State Power South Company and was designed by SIEMENS company for delivery, supervision of erection and commissioning. The power demand of the growing Chinese industries requires an economical solution for an increase of power transfer capability and stability with the existing lines. A combination of fixed and controlled series compensation has been found as the appropriate choice not only to enable the desired power increase, but also to stabilize the two interconnected strong networks by reducing the connecting line impedance. Both capacitors, located in the two parallel lines, are operating since mid of November 2003. This paper will give an overview of the design philosophy of the compensation system and for the choice of the component rating for the fixed as well as the controllable segment of the series capacitor scheme.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"1998 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1338501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

In the late summer of 2002 the Tian Guang series compensation scheme located in the Tianshengqiao-Guangdong 550 kV ac-network has been ordered by State Power South Company and was designed by SIEMENS company for delivery, supervision of erection and commissioning. The power demand of the growing Chinese industries requires an economical solution for an increase of power transfer capability and stability with the existing lines. A combination of fixed and controlled series compensation has been found as the appropriate choice not only to enable the desired power increase, but also to stabilize the two interconnected strong networks by reducing the connecting line impedance. Both capacitors, located in the two parallel lines, are operating since mid of November 2003. This paper will give an overview of the design philosophy of the compensation system and for the choice of the component rating for the fixed as well as the controllable segment of the series capacitor scheme.
设计方面的中国500kv可控硅控制串联补偿方案TCSC田光
2002年夏末,位于天圣桥-广东550kv交流电网的天光系列补偿方案已由国家南方电力公司定货,由西门子公司设计交付、监督安装和调试。日益增长的中国工业的电力需求需要一个经济的解决方案,以增加现有线路的电力传输能力和稳定性。固定和受控串联补偿的组合不仅可以实现所需的功率增加,而且可以通过降低连接线阻抗来稳定两个互连的强网络。位于两条平行线上的两个电容器自2003年11月中旬开始运行。本文将概述补偿系统的设计理念,以及串联电容方案中固定和可控部分的元件额定值的选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信