{"title":"Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling Method","authors":"Z. Xiaojun, Hu Hongyun, Wang Xiaofeng","doi":"10.1109/ICDMA.2013.107","DOIUrl":null,"url":null,"abstract":"The design of a subway station that crosses an urban trunk road for automobiles in Chengdu city is summarized in this paper. In view of its special location and structural design, the subway station is built in combination with open cut and tunneling method, its structure consists of three different parts, which includes two reinforced concrete frame structures and a bored tunnel with side platforms. The frame structure is built with open cut method, but the bored tunnel with platform is built by means of tunneling method. The structure and construction process are both summarized in the paper. The scenario may provide guidance for the design and construction of such peculiar subway station under similar circumstances.","PeriodicalId":403312,"journal":{"name":"2013 Fourth International Conference on Digital Manufacturing & Automation","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Fourth International Conference on Digital Manufacturing & Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDMA.2013.107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
The design of a subway station that crosses an urban trunk road for automobiles in Chengdu city is summarized in this paper. In view of its special location and structural design, the subway station is built in combination with open cut and tunneling method, its structure consists of three different parts, which includes two reinforced concrete frame structures and a bored tunnel with side platforms. The frame structure is built with open cut method, but the bored tunnel with platform is built by means of tunneling method. The structure and construction process are both summarized in the paper. The scenario may provide guidance for the design and construction of such peculiar subway station under similar circumstances.