Engineering Evaluation for Avalanche Risk Along the Tohoku Shinkansen Between Morioka and Hachinohe

Junichi Niiyama, H. Matsuda, S. Iikura, K. Kawashima, Toshishige Fujii
{"title":"Engineering Evaluation for Avalanche Risk Along the Tohoku Shinkansen Between Morioka and Hachinohe","authors":"Junichi Niiyama, H. Matsuda, S. Iikura, K. Kawashima, Toshishige Fujii","doi":"10.4106/JSSE.19.91","DOIUrl":null,"url":null,"abstract":"SYNOPSIS The authors discussed the existing method to evaluate the avalanche risk for Hokuriku Shinkansen, and specified its meanings from the engineering viewpoint. In the method, the avalanche risk was determined qualitatively as the product of starting risk and the risk to reach the site under consideration. However, the meaning of the calculated avalanche risk was not defined in qualitative terms. In order to take measures against the avalanche for Tohoku Shinkansen from Morioka to Hachinohe at the entrance of each mountain tunnel, the risk was first evaluated by using the same method as that for Hokuriku Shinkansen. Second, the resistance to the expected avalanche load was discussed with special attention paid to the existing structures, such as buffering works to minimize the effect of micro-pressure waves. Consequently, the avalanche resistance of the existing structures was found to be approximately 20kN/m2. Furthermore, avalanches with a load of not less than 20 kN/m2 may occur at slopes whose avalanche risk was greater than 70%.","PeriodicalId":199097,"journal":{"name":"Journal of Snow Engineering of Japan","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Snow Engineering of Japan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4106/JSSE.19.91","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

SYNOPSIS The authors discussed the existing method to evaluate the avalanche risk for Hokuriku Shinkansen, and specified its meanings from the engineering viewpoint. In the method, the avalanche risk was determined qualitatively as the product of starting risk and the risk to reach the site under consideration. However, the meaning of the calculated avalanche risk was not defined in qualitative terms. In order to take measures against the avalanche for Tohoku Shinkansen from Morioka to Hachinohe at the entrance of each mountain tunnel, the risk was first evaluated by using the same method as that for Hokuriku Shinkansen. Second, the resistance to the expected avalanche load was discussed with special attention paid to the existing structures, such as buffering works to minimize the effect of micro-pressure waves. Consequently, the avalanche resistance of the existing structures was found to be approximately 20kN/m2. Furthermore, avalanches with a load of not less than 20 kN/m2 may occur at slopes whose avalanche risk was greater than 70%.
东北新干线森冈至八野之间的雪崩风险工程评估
摘要讨论了北陆新干线现有的雪崩危险性评价方法,并从工程角度阐述了其意义。在该方法中,雪崩风险定性地确定为出发风险和到达考虑地点风险的乘积。然而,计算出的雪崩风险的含义并没有定性的定义。为了对东北新干线森冈至八户线各山道入口处的雪崩采取预防措施,首先采用与北陆新干线相同的方法进行了风险评估。其次,讨论了对预期雪崩荷载的抵抗,并特别关注现有结构,如缓冲工程,以尽量减少微压力波的影响。因此,现有结构的抗雪崩能力约为20kN/m2。在雪崩危险性大于70%的斜坡上,可能发生不小于20 kN/m2的雪崩荷载。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信