The hole story: How a sinkhole in a phosphogypsum pile was explored and remediated

N. Fuleihan, J. E. Cameron, J. F. Henry
{"title":"The hole story: How a sinkhole in a phosphogypsum pile was explored and remediated","authors":"N. Fuleihan, J. E. Cameron, J. F. Henry","doi":"10.1201/9781003078128-47","DOIUrl":null,"url":null,"abstract":"On June 27, 1994, an erosion sinkhole occurred in the original 200-foot high phosphogypsum stack at the New Wales Plant ofIMC-Agrico Company. As a result, a plan of action was expediently developed to assess groundwater impacts and ensure that any contamination is contained on property, recovered, and appropriately handled at the plant. Shortly thereafter, resources were mobilized to define the extent of the erosion cavity in the natural confining unit beneath the stack, and to formulate and undertake appropriate repairs.","PeriodicalId":231730,"journal":{"name":"The Engineering Geology and Hydrology of Karst Terrains","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Engineering Geology and Hydrology of Karst Terrains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078128-47","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

On June 27, 1994, an erosion sinkhole occurred in the original 200-foot high phosphogypsum stack at the New Wales Plant ofIMC-Agrico Company. As a result, a plan of action was expediently developed to assess groundwater impacts and ensure that any contamination is contained on property, recovered, and appropriately handled at the plant. Shortly thereafter, resources were mobilized to define the extent of the erosion cavity in the natural confining unit beneath the stack, and to formulate and undertake appropriate repairs.
洞的故事:一个磷石膏堆的天坑是如何被探测和修复的
1994年6月27日,imc - agrico公司新南威尔士工厂原有的200英尺高的磷石膏堆发生了侵蚀性天坑。因此,迅速制定了一项行动计划,以评估对地下水的影响,并确保任何污染都在工厂内得到控制、回收和适当处理。此后不久,我们调动了资源来确定储层下方天然围封单元的侵蚀腔的范围,并制定和实施适当的修复措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信