Risk assessment in research projects

R. Schmidt
{"title":"Risk assessment in research projects","authors":"R. Schmidt","doi":"10.1109/RAMS.2010.5448039","DOIUrl":null,"url":null,"abstract":"The industry for renewable energy like windpower is requesting equipment with low failures and a high reliability over quite a long time period. This is especially important for offshore wind parks as maintenance is challenging. Approaches are necessary to fulfill these requests for less failures and higer reliability without cost explosion. The earlier in the product development process reliability and risk assessment is performed, the easier and cheaper is a design improvement. Therefore, it is important to include risk assessment already in research and predevelopment projects. For a good risk assessment structured methods are necessary. Failure Mode and Effect Analysis (FMEA) and Design Review Based on Failure Mode (DRBFM) are discussed, experiences are shared, and adapations are shown how FMEA and DRBFM can be a used in a creative and structured way in research projects.","PeriodicalId":299782,"journal":{"name":"2010 Proceedings - Annual Reliability and Maintainability Symposium (RAMS)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Proceedings - Annual Reliability and Maintainability Symposium (RAMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2010.5448039","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

The industry for renewable energy like windpower is requesting equipment with low failures and a high reliability over quite a long time period. This is especially important for offshore wind parks as maintenance is challenging. Approaches are necessary to fulfill these requests for less failures and higer reliability without cost explosion. The earlier in the product development process reliability and risk assessment is performed, the easier and cheaper is a design improvement. Therefore, it is important to include risk assessment already in research and predevelopment projects. For a good risk assessment structured methods are necessary. Failure Mode and Effect Analysis (FMEA) and Design Review Based on Failure Mode (DRBFM) are discussed, experiences are shared, and adapations are shown how FMEA and DRBFM can be a used in a creative and structured way in research projects.
研究项目的风险评估
风能等可再生能源行业要求设备在相当长的一段时间内具有低故障和高可靠性。这对海上风电场尤其重要,因为维护起来很有挑战性。为了满足这些要求,减少故障,提高可靠性,避免成本爆炸,有必要采取措施。在产品开发过程中越早进行可靠性和风险评估,设计改进就越容易,成本也越低。因此,在研究和开发前项目中纳入风险评估是很重要的。对于一个好的风险评估,结构化的方法是必要的。讨论了失效模式和影响分析(FMEA)和基于失效模式的设计评审(DRBFM),分享了经验,并展示了FMEA和DRBFM如何在研究项目中以创造性和结构化的方式使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信