"Zero Injury" safety program implementation as related to current construction industry financial risk management: a success story

T. Crangle
{"title":"\"Zero Injury\" safety program implementation as related to current construction industry financial risk management: a success story","authors":"T. Crangle","doi":"10.1109/TDCLLM.1998.668339","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.","PeriodicalId":328713,"journal":{"name":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO '98 - 1998 IEEE 8th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance Proceedings ESMO '98 Proceedings. ESMO 98 The Power is in Your Hand","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1998.668339","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The purpose of this paper is to describe: results of research done by Clemson University for the Construction Industry Institute (CII) through the Zero Injury Task Force; successful implementation of Zero Injury Safety Program in the Tennessee Valley Authority Division of Transmission Construction where a Zero Injury Goal (Zero Lost Workday Case Incident Rate) was achieved and sustained for 2 1/2 years; and the latest in financial and construction risk management in the construction industry and applied to electric utility transmission construction, operation, and maintenance using inhouse and contract forces.
“零伤害”安全项目的实施与当前建筑行业财务风险管理的成功案例
本文的目的是描述:克莱姆森大学通过零伤害工作组为建筑工业研究所(CII)所做的研究结果;在田纳西河谷管理局输电建设部门成功实施了零伤害安全计划,实现了零伤害目标(零工作日损失事故发生率),并持续了两年半;并将最新的财务和施工风险管理应用于建筑行业,并将其应用于电力公用事业输变电施工、运营和维护中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信