{"title":"DIGITAL OIL FIELD FROM DATA TO REAL - TIME DECISION MAKING -SMART WORKING FOR OPERATIONS EFFICIENCY","authors":"Mohammad Rostami Dehka, I. Nistor","doi":"10.51865/jpgt.2021.01.01","DOIUrl":null,"url":null,"abstract":"Digital Oil Field (DOF) project in OMV Petrom aims to remotely monitor, troubleshoot and optimize operations and maintenance data and activities in a modern manner, and to foster value creation through increased integrated and reliable performance data availability to skilled professionals in order to facilitate the right decisions. DOF Project started as a pilot in an oil field, covering a large area of automated wells and facilities. The pilot field is operating around 400 wells equipped with PCP (progressive cavity pump) and more than 70% automated facilities consisting of: 14 MPSs (Meter Point Skids), 2 PMANs (Production Manifolds) and 1 OMS (Oil Metering Station), all connected to SCADA systems.","PeriodicalId":208076,"journal":{"name":"Romanian Journal of Petroleum & Gas Technology","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Romanian Journal of Petroleum & Gas Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51865/jpgt.2021.01.01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Digital Oil Field (DOF) project in OMV Petrom aims to remotely monitor, troubleshoot and optimize operations and maintenance data and activities in a modern manner, and to foster value creation through increased integrated and reliable performance data availability to skilled professionals in order to facilitate the right decisions. DOF Project started as a pilot in an oil field, covering a large area of automated wells and facilities. The pilot field is operating around 400 wells equipped with PCP (progressive cavity pump) and more than 70% automated facilities consisting of: 14 MPSs (Meter Point Skids), 2 PMANs (Production Manifolds) and 1 OMS (Oil Metering Station), all connected to SCADA systems.