Adel Uoenes Mohamed Abd El-Rahman, A. Eid, H. Eldaly
{"title":"Assessing planning impact on time and cost in Construction projects","authors":"Adel Uoenes Mohamed Abd El-Rahman, A. Eid, H. Eldaly","doi":"10.21608/IJAEUR.2021.186759","DOIUrl":null,"url":null,"abstract":"The construction projects in Egypt Exposed to risk because the impact of planning not based on the knowledge or full data of the project parameters, it will lead to the timeline implementation of the project will not be as planned. Research objectives: support the main objective of the project management includes (time – quality – cost) that is the main reason for the success of any project. The research method includes the theoretical methodology and practical methodology. The theoretical methodology includes the definition of project management’s method shortcut in general, construction projects less knowledge and data of engineering planning method within stakeholders includes such as owners, project management team, consultant. The practical methodology going to be within comparing between three projects and found out the reasons “why the project timeline affected and not been qualified?” one of the projects is economic housing is been late 10 years and been stopped of implementation which affects over buildings quality, analysis the results then work within statistics then came out with recommendations.","PeriodicalId":133899,"journal":{"name":"International Journal of Architectural Engineering and Urban Research","volume":"2013 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Architectural Engineering and Urban Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21608/IJAEUR.2021.186759","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The construction projects in Egypt Exposed to risk because the impact of planning not based on the knowledge or full data of the project parameters, it will lead to the timeline implementation of the project will not be as planned. Research objectives: support the main objective of the project management includes (time – quality – cost) that is the main reason for the success of any project. The research method includes the theoretical methodology and practical methodology. The theoretical methodology includes the definition of project management’s method shortcut in general, construction projects less knowledge and data of engineering planning method within stakeholders includes such as owners, project management team, consultant. The practical methodology going to be within comparing between three projects and found out the reasons “why the project timeline affected and not been qualified?” one of the projects is economic housing is been late 10 years and been stopped of implementation which affects over buildings quality, analysis the results then work within statistics then came out with recommendations.