{"title":"The economic effect analysis of PPP model in urban rail transit — Illustrated by the London Underground and Beijing Metro Line 4","authors":"Chen Liao","doi":"10.1109/IEIS.2016.7551885","DOIUrl":null,"url":null,"abstract":"Public Private Partnership is a new financing model and has been used in constructing public facilities. In this way, government attracts social capital to reduce the financial burden, enterprises earn revenue through private investment, and both of them ultimately achieve a win-win outcome. However, successful implementation of the PPP model requires us to balance many factors. This paper analyzes the failure of the London Underground PPP project and the success of Beijing Metro Line 4 and makes some suggestions, hoping that it can be served as a reference for the implementation of PPP projects in the future, better promoting the construction of public facilities.","PeriodicalId":334364,"journal":{"name":"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Industrial Economics System and Industrial Security Engineering (IEIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEIS.2016.7551885","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
Public Private Partnership is a new financing model and has been used in constructing public facilities. In this way, government attracts social capital to reduce the financial burden, enterprises earn revenue through private investment, and both of them ultimately achieve a win-win outcome. However, successful implementation of the PPP model requires us to balance many factors. This paper analyzes the failure of the London Underground PPP project and the success of Beijing Metro Line 4 and makes some suggestions, hoping that it can be served as a reference for the implementation of PPP projects in the future, better promoting the construction of public facilities.