Shunt capacitor renewal planning through cost leveling strategy using condition age model

Yuta Tanaka, Ken Suzuki, S. Iwamoto
{"title":"Shunt capacitor renewal planning through cost leveling strategy using condition age model","authors":"Yuta Tanaka, Ken Suzuki, S. Iwamoto","doi":"10.1109/ASSCC.2012.6523275","DOIUrl":null,"url":null,"abstract":"Past high economic growth in Japan sharply increased power demands year after year. Japanese utilities therefore installed shunt capacitors (SCs) to help voltage profiles and stability meet predicted demands, but some aging SCs will soon need to be replaced. Recent large-scale introduction of Photo Voltaic (PV) systems may lead to voltage stability problems, and there are SC renewal planning problem. This paper addresses the issue of SC replacement with other voltage control equipment. In addition, economic evaluation techniques have caught the interest of power system asset managers. We propose a new fundamental renewal planning method with renewal period cost leveling using the condition age model. Simulations of the IEEJ 30-machine 115-bus system confirm the validity of the proposed method.","PeriodicalId":341348,"journal":{"name":"2012 10th International Power & Energy Conference (IPEC)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 10th International Power & Energy Conference (IPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASSCC.2012.6523275","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Past high economic growth in Japan sharply increased power demands year after year. Japanese utilities therefore installed shunt capacitors (SCs) to help voltage profiles and stability meet predicted demands, but some aging SCs will soon need to be replaced. Recent large-scale introduction of Photo Voltaic (PV) systems may lead to voltage stability problems, and there are SC renewal planning problem. This paper addresses the issue of SC replacement with other voltage control equipment. In addition, economic evaluation techniques have caught the interest of power system asset managers. We propose a new fundamental renewal planning method with renewal period cost leveling using the condition age model. Simulations of the IEEJ 30-machine 115-bus system confirm the validity of the proposed method.
基于状态年龄模型的成本均衡策略的并联电容器更新规划
日本过去的高速经济增长使电力需求年复一年地急剧增加。因此,日本公用事业公司安装了分流电容器(sc),以帮助电压分布和稳定性满足预测的需求,但一些老化的sc将很快需要更换。近期大规模引进光伏发电系统可能导致电压稳定问题,并存在电网更新规划问题。本文讨论了用其他电压控制设备替换SC的问题。此外,经济评估技术也引起了电力系统资产管理者的兴趣。利用条件年龄模型,提出了一种新的基于更新周期成本均衡的基本更新计划方法。对ieej30 -machine 115总线系统的仿真验证了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信