{"title":"Flexible load following the wind power generation","authors":"M. P. Moghaddam, P. T. Baboli, E. Alishahi, F. Lotfifard","doi":"10.1109/ENERGYCON.2010.5771792","DOIUrl":null,"url":null,"abstract":"This paper presents a method for demand side management considering the amount of wind power generation. The intermittency of wind power may cause several problems like inadequacy of power, congestion in transmission lines, and power quality. All these technical concerns lead to financial challenges in power market. In this paper, a new concept of flexible loads following the wind farm output power is proposed, where several objectives are optimized through a two stage approach. In the first stage, the available transmission capacity (ATC) of the transmission corridor is maximized while the losses are minimized. In the second stage, the base load power purchased from adjacent network is maximized when the peak of exchanged power is minimized. Numerical studies are conducted to evaluate the performance of the proposed method.","PeriodicalId":386008,"journal":{"name":"2010 IEEE International Energy Conference","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE International Energy Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYCON.2010.5771792","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

Abstract

This paper presents a method for demand side management considering the amount of wind power generation. The intermittency of wind power may cause several problems like inadequacy of power, congestion in transmission lines, and power quality. All these technical concerns lead to financial challenges in power market. In this paper, a new concept of flexible loads following the wind farm output power is proposed, where several objectives are optimized through a two stage approach. In the first stage, the available transmission capacity (ATC) of the transmission corridor is maximized while the losses are minimized. In the second stage, the base load power purchased from adjacent network is maximized when the peak of exchanged power is minimized. Numerical studies are conducted to evaluate the performance of the proposed method.
柔性负荷跟随风力发电
本文提出了一种考虑风力发电量的需求侧管理方法。风力发电的间歇性会引起电力不足、输电线路堵塞、电能质量等问题。所有这些技术问题导致了电力市场的资金挑战。本文提出了风电场输出功率后柔性负荷的新概念,其中通过两阶段方法对多个目标进行优化。在第一阶段,输电走廊的可用传输容量(ATC)最大,而损耗最小。在第二阶段,当交换功率的峰值最小时,从相邻电网购买的基本负荷功率最大。通过数值研究对该方法的性能进行了评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信