{"title":"Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities","authors":"D. Stefanyshyn","doi":"10.32347/2411-4049.2019.3.33-45","DOIUrl":null,"url":null,"abstract":"The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.","PeriodicalId":313972,"journal":{"name":"Environmental safety and natural resources","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental safety and natural resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32347/2411-4049.2019.3.33-45","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.
考虑到未使用的可能性的风险,在乌克兰建造新的水力发电厂的可行性分析
本文介绍了根据我国政府于2016年批准的至2026年水电开发计划在乌克兰建设新水电站的可行性分析结果。特别是,对建设卡霍夫卡2号水电站和德涅斯特河上的6座新水电站以及在国内开发小水电的远景计划进行了分析。可行性分析以总风险最小为准则,考虑未利用机会的风险,对备选方案进行两两比较。替代方案的总风险组成部分以无量纲单位估计水能、可操作性特征和新水电集合体的调试成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信