Simulation and Optimization of Production Line in Em-plant based Assembly Workshop

Hongying Shan, Lina Li, Yu Yuan, Chuang Wang
{"title":"Simulation and Optimization of Production Line in Em-plant based Assembly Workshop","authors":"Hongying Shan, Lina Li, Yu Yuan, Chuang Wang","doi":"10.1109/IEEM.2018.8607605","DOIUrl":null,"url":null,"abstract":"Taking the dynamic production of a line in the assembly shop of a company's rear axle as an example, the on-site investigation confirmed the basic data and analyzed the assembly process. Em-plant software was used to model the dynamic simulation of each station on the assembly line. According to the simulation results, the bottleneck process is improved, and combined with ECRS principles in lean production, it is eliminate, combine, rearrange and simplify. Under the actual production conditions, an optimization scheme was proposed. After the improvement plan was implemented, the simulation results showed that the production capacity was significantly improved, the assembly line imbalance was improved, and the company's efficiency was improved.","PeriodicalId":119238,"journal":{"name":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2018.8607605","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Taking the dynamic production of a line in the assembly shop of a company's rear axle as an example, the on-site investigation confirmed the basic data and analyzed the assembly process. Em-plant software was used to model the dynamic simulation of each station on the assembly line. According to the simulation results, the bottleneck process is improved, and combined with ECRS principles in lean production, it is eliminate, combine, rearrange and simplify. Under the actual production conditions, an optimization scheme was proposed. After the improvement plan was implemented, the simulation results showed that the production capacity was significantly improved, the assembly line imbalance was improved, and the company's efficiency was improved.
基于em工厂的装配车间生产线仿真与优化
以某公司后桥装配车间某生产线的动态生产为例,现场调研确认了基本数据,并对装配过程进行了分析。采用Em-plant软件对装配线上各工位进行了动态仿真建模。根据仿真结果,对瓶颈过程进行改进,并结合精益生产中的ECRS原理,对其进行剔除、组合、重组和简化。结合实际生产条件,提出了优化方案。改进方案实施后,仿真结果表明,生产能力得到显著提高,装配线不平衡得到改善,公司效率得到提高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信