{"title":"Identification of power system models for large scale damping control","authors":"J. Hauer","doi":"10.1109/CDC.1989.70476","DOIUrl":null,"url":null,"abstract":"The a priori models used to plan large electrical power systems are often inadequate for the development of robust large-scale damping controls. Methods that are used at the Bonneville Power Administration to construct measurement-based models of the controlled plant and the source noise are presented. The identification procedures include frequency-domain fitting of structured rational-block models and time-domain fitting with an extended version of Prony's method. Comparative results are shown for a recent test of the western North American power system.<<ETX>>","PeriodicalId":156565,"journal":{"name":"Proceedings of the 28th IEEE Conference on Decision and Control,","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1989-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 28th IEEE Conference on Decision and Control,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1989.70476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10
Abstract
The a priori models used to plan large electrical power systems are often inadequate for the development of robust large-scale damping controls. Methods that are used at the Bonneville Power Administration to construct measurement-based models of the controlled plant and the source noise are presented. The identification procedures include frequency-domain fitting of structured rational-block models and time-domain fitting with an extended version of Prony's method. Comparative results are shown for a recent test of the western North American power system.<>