Evaluation of Rebar Waste Rate Calculation Model Utilizing BIM Function: High Rise Building Case Study

Ryan Faza, Rama Adjie Darmawan, Danny Triputra Setiamanah
{"title":"Evaluation of Rebar Waste Rate Calculation Model Utilizing BIM Function: High Rise Building Case Study","authors":"Ryan Faza, Rama Adjie Darmawan, Danny Triputra Setiamanah","doi":"10.34306/att.v5i2.298","DOIUrl":null,"url":null,"abstract":"The process that has the potential to generate construction waste is a construction operational process so that in this process it is necessary to make efforts to carry out waste control in real-time as a form of effort by the construction industry to play a role in suppressing waste production. BIM is one of the supporting tools for project productivity whose function can be used to evaluate the level of construction waste, especially rebar waste which is one of the source materials for construction waste. The purpose of this study is to test the modeling of the calculation of the rebar waste rate utilizing the function of the BIM so that it can be used as an alternative tool for evaluating the level of waste in real-time. The calculation modeling obtained from previous research was successfully tested on a case study of a high-rise building project and obtained the rebar waste rate at a certain time in accordance with the progress of work in the project site. From this research, it can be concluded that the calculation modeling can be carried out on high-rise building projects.","PeriodicalId":143921,"journal":{"name":"Aptisi Transactions on Technopreneurship (ATT)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Aptisi Transactions on Technopreneurship (ATT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34306/att.v5i2.298","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The process that has the potential to generate construction waste is a construction operational process so that in this process it is necessary to make efforts to carry out waste control in real-time as a form of effort by the construction industry to play a role in suppressing waste production. BIM is one of the supporting tools for project productivity whose function can be used to evaluate the level of construction waste, especially rebar waste which is one of the source materials for construction waste. The purpose of this study is to test the modeling of the calculation of the rebar waste rate utilizing the function of the BIM so that it can be used as an alternative tool for evaluating the level of waste in real-time. The calculation modeling obtained from previous research was successfully tested on a case study of a high-rise building project and obtained the rebar waste rate at a certain time in accordance with the progress of work in the project site. From this research, it can be concluded that the calculation modeling can be carried out on high-rise building projects.
利用BIM功能的钢筋浪费率计算模型评价——以高层建筑为例
有可能产生建筑废物的过程是一个建筑操作过程,因此在这个过程中,有必要努力实时进行废物控制,作为建筑行业努力的一种形式,以发挥抑制废物产生的作用。BIM是项目生产力的辅助工具之一,其功能可以用来评估建筑垃圾的水平,尤其是钢筋垃圾,它是建筑垃圾的来源之一。本研究的目的是测试利用BIM的功能计算钢筋浪费率的建模,以便它可以用作实时评估浪费水平的替代工具。通过对某高层建筑工程的实例分析,成功地验证了前人研究所得的计算模型,并根据工程现场的施工进度得到了某一时刻的钢筋废废率。通过本研究可以得出结论,可以对高层建筑工程进行计算建模。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
CiteScore
4.20
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信