{"title":"Stay-Out Adjustments and Multi-Year Regulatory Rate Plans","authors":"R. Davies, Kathleen T. Hevert","doi":"10.2139/ssrn.2698396","DOIUrl":null,"url":null,"abstract":"Multi-year regulatory rate plans are becoming more common. An agreement to \"stay out\" of the rate revision process removes an option for the utility company or regulatory commission to request a modification to tariff rates in response to changes in interest rates. This paper develops an objective approach to adjust the utility’s required cost of equity to account for these lost options. The paper also shows how to account for the ability of the utility to pay a fixed monetary penalty to request a rate review prior to the end of the stay-out period.","PeriodicalId":308577,"journal":{"name":"SPGMI: SNL Energy Data (Topic)","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SPGMI: SNL Energy Data (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2698396","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Multi-year regulatory rate plans are becoming more common. An agreement to "stay out" of the rate revision process removes an option for the utility company or regulatory commission to request a modification to tariff rates in response to changes in interest rates. This paper develops an objective approach to adjust the utility’s required cost of equity to account for these lost options. The paper also shows how to account for the ability of the utility to pay a fixed monetary penalty to request a rate review prior to the end of the stay-out period.
退市调整和多年监管费率计划
多年监管费率计划正变得越来越普遍。“不参与”电价调整过程的协议取消了公用事业公司或监管委员会根据利率变化要求调整电价的选项。本文发展了一种客观的方法来调整公用事业公司所需的权益成本,以考虑这些损失的期权。该文件还显示了如何说明公用事业公司支付固定货币罚款的能力,以便在停工期结束前要求进行费率审查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信