Kajian Geometri Jalan Tambang Terhadap Produksi Pengangkutan Batu Andesit pada PT Silva Andia Utama di Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat

Rama Aditya, Zaenal, Noor Fauzi Isniarno
{"title":"Kajian Geometri Jalan Tambang Terhadap Produksi Pengangkutan Batu Andesit pada PT Silva Andia Utama di Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat","authors":"Rama Aditya, Zaenal, Noor Fauzi Isniarno","doi":"10.29313/bcsme.v3i1.5598","DOIUrl":null,"url":null,"abstract":"Abstract. PT Silva Andia Utama is an andesite mining company located in Giriasih Village, Batujajar District, West Bandung Regency, West Java Province. The failure to achieve the production target of 15,292.8 BCM/month is a problem for this company, where one of the factors is the non-standard road geometry, such as narrow road widths which result in the means of conveyance not working optimally, thus affecting the cycle time of the equipment. From these problems, it is necessary to improve the geometry of the mine road to maximize the speed of the conveyance, so that the conveyance cycle time decreases and production increases. This study discusses the influence of mining road geometry on increasing productivity based on AASHTO (American Association of State Highway and Transportation Officials) and Ministerial Decree No. 1827/K/30/MEM/2018, which concerns road geometry including straight road width, bend condition road width, grade, bend radius, cross slope, superelevation, and actual Rimpull calculations . In this mine road geometry study, it is then linked to the production of digging-loading and hauling equipment to increase mining production of andesite. The results of this study obtain production in actual conditions of 13.534,5 BCM/month. The actual calculation results for this production have not reached the production target, so one of the factors in increasing production is the need to improve the geometry of mine roads that do not meet AASHTO (American Association of State Highway and Transportation Officials) standards and Ministerial Decree No.1827/K/30/MEM/2018. In the actual mining road geometry conditions, the average straight road width is 8.25 meters and for the bend condition road width is an average of 7.27 meters. On the slope of the road (grade) obtained a value of 0% - 21.22% in theoritical conditions. After repairing the geometry of mine road the production value of the conveyance of 16,929,12  BCM/month. With this value, production will increase, so that the production target desired by the company is achieved. \nKeywords: AASHTO, Cycle Time, Road Geometry, Production. \nAbstrak. PT Silva Andia Utama merupakan salah satu perusahaan penambangan batu andesit yang terletak di Desa Giriasih, Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat. Tidak tercapainya target produksi sebesar 15.292,8 BCM/bulan menjadi permasalahan di perusahaan ini, dimana salah satu faktornya adalah geometri jalan yang tidak sesuai standar, seperti lebar jalan yang sempit mengakibatkan alat angkut tidak bekerja secara optimal, sehingga berpengaruh terhadap waktu edar alat tersebut. Dari permasalahan tersebut, maka perlu dilakukannya perbaikan geometri jalan tambang untuk memaksimalkan kecepatan pada alat angkut, sehingga waktu edar alat angkut turun dan produksi meningkat. Penelitian ini membahas mengenai pengaruh geometri jalan tambang terhadap peningkatan produktivitas berdasarkan AASHTO  (American Association of State Highway and Transportation Officials) dan Kepmen No. 1827/K/30/MEM/2018, yaitu mengenai geometri jalan meliputi lebar jalan kondisi lurus, lebar jalan kondisi tikungan, kemiringan jalan (grade), jari-jari tikungan, kemiringan melintang (cross slope), dan superelevasi secara aktual. Pada kajian geometri jalan tambang ini, kemudian dikaitkan dengan produksi alat gali-muat dan angkut untuk meningkatkan produksi penambangan batu andesit.  Hasil penelitian ini mendapatkan produksi dalam keadaan aktual sebesar 13.534,5 BCM/bulan. Hasil perhitungan secara aktual pada produksi tersebut belum mencapai target produksi, sehingga salah satu faktor dalam meningkatkan produksi perlu dilakukan perbaikan geometri jalan tambang yang belum memenuhi standar AASHTO  (American Association of State Highway and Transportation Officials) dan Kepmen No. 1827/K/30/MEM/2018. Pada kondisi aktual geometri jalan tambang untuk lebar jalan kondisi lurus rata-rata 8,25 meter dan untuk lebar jalan kondisi tikungan rata-rata 7,27 meter. Pada kemiringan jalan (grade) didapat nilai sebesar 0% - 21,22% dalam kondisi teoritis. Setelah dilakukan perbaikan geometri jalan tambang didapat nilai produksi alat angkut sebesar 16,929,12 BCM/bulan. Dengan nilai tersebut produksi akan meningkat, sehingga target produksi yang diinginkan oleh perusahaan tercapai. \nKata Kunci: AASHTO, Waktu Edar, Geometri Jalan, Produksi.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"164 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i1.5598","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. PT Silva Andia Utama is an andesite mining company located in Giriasih Village, Batujajar District, West Bandung Regency, West Java Province. The failure to achieve the production target of 15,292.8 BCM/month is a problem for this company, where one of the factors is the non-standard road geometry, such as narrow road widths which result in the means of conveyance not working optimally, thus affecting the cycle time of the equipment. From these problems, it is necessary to improve the geometry of the mine road to maximize the speed of the conveyance, so that the conveyance cycle time decreases and production increases. This study discusses the influence of mining road geometry on increasing productivity based on AASHTO (American Association of State Highway and Transportation Officials) and Ministerial Decree No. 1827/K/30/MEM/2018, which concerns road geometry including straight road width, bend condition road width, grade, bend radius, cross slope, superelevation, and actual Rimpull calculations . In this mine road geometry study, it is then linked to the production of digging-loading and hauling equipment to increase mining production of andesite. The results of this study obtain production in actual conditions of 13.534,5 BCM/month. The actual calculation results for this production have not reached the production target, so one of the factors in increasing production is the need to improve the geometry of mine roads that do not meet AASHTO (American Association of State Highway and Transportation Officials) standards and Ministerial Decree No.1827/K/30/MEM/2018. In the actual mining road geometry conditions, the average straight road width is 8.25 meters and for the bend condition road width is an average of 7.27 meters. On the slope of the road (grade) obtained a value of 0% - 21.22% in theoritical conditions. After repairing the geometry of mine road the production value of the conveyance of 16,929,12  BCM/month. With this value, production will increase, so that the production target desired by the company is achieved. Keywords: AASHTO, Cycle Time, Road Geometry, Production. Abstrak. PT Silva Andia Utama merupakan salah satu perusahaan penambangan batu andesit yang terletak di Desa Giriasih, Kecamatan Batujajar, Kabupaten Bandung Barat, Provinsi Jawa Barat. Tidak tercapainya target produksi sebesar 15.292,8 BCM/bulan menjadi permasalahan di perusahaan ini, dimana salah satu faktornya adalah geometri jalan yang tidak sesuai standar, seperti lebar jalan yang sempit mengakibatkan alat angkut tidak bekerja secara optimal, sehingga berpengaruh terhadap waktu edar alat tersebut. Dari permasalahan tersebut, maka perlu dilakukannya perbaikan geometri jalan tambang untuk memaksimalkan kecepatan pada alat angkut, sehingga waktu edar alat angkut turun dan produksi meningkat. Penelitian ini membahas mengenai pengaruh geometri jalan tambang terhadap peningkatan produktivitas berdasarkan AASHTO  (American Association of State Highway and Transportation Officials) dan Kepmen No. 1827/K/30/MEM/2018, yaitu mengenai geometri jalan meliputi lebar jalan kondisi lurus, lebar jalan kondisi tikungan, kemiringan jalan (grade), jari-jari tikungan, kemiringan melintang (cross slope), dan superelevasi secara aktual. Pada kajian geometri jalan tambang ini, kemudian dikaitkan dengan produksi alat gali-muat dan angkut untuk meningkatkan produksi penambangan batu andesit.  Hasil penelitian ini mendapatkan produksi dalam keadaan aktual sebesar 13.534,5 BCM/bulan. Hasil perhitungan secara aktual pada produksi tersebut belum mencapai target produksi, sehingga salah satu faktor dalam meningkatkan produksi perlu dilakukan perbaikan geometri jalan tambang yang belum memenuhi standar AASHTO  (American Association of State Highway and Transportation Officials) dan Kepmen No. 1827/K/30/MEM/2018. Pada kondisi aktual geometri jalan tambang untuk lebar jalan kondisi lurus rata-rata 8,25 meter dan untuk lebar jalan kondisi tikungan rata-rata 7,27 meter. Pada kemiringan jalan (grade) didapat nilai sebesar 0% - 21,22% dalam kondisi teoritis. Setelah dilakukan perbaikan geometri jalan tambang didapat nilai produksi alat angkut sebesar 16,929,12 BCM/bulan. Dengan nilai tersebut produksi akan meningkat, sehingga target produksi yang diinginkan oleh perusahaan tercapai. Kata Kunci: AASHTO, Waktu Edar, Geometri Jalan, Produksi.
摘要。PT Silva Andia Utama是一家安山岩采矿公司,位于西爪哇省西万隆县Batujajar区Giriasih村。未能达到15,292.8 BCM/月的生产目标是该公司的一个问题,其中一个因素是非标准的道路几何形状,例如狭窄的道路宽度导致运输工具无法最佳工作,从而影响设备的周期时间。从这些问题出发,有必要改进矿山道路的几何形状,使输送速度最大化,从而缩短输送周期,提高产量。本研究基于AASHTO(美国国家公路和运输官员协会)和第1827/K/30/MEM/2018号部令,讨论了采矿道路几何形状对提高生产率的影响,其中涉及道路几何形状,包括直路宽度、弯道条件道路宽度、坡度、弯道半径、交叉坡度、超高标高和实际边缘拉计算。在本矿山道路几何研究中,将其与挖掘装载和运输设备的生产联系起来,以增加安山岩的开采产量。研究结果表明,实际条件下产量为13534.5 BCM/月。本次生产的实际计算结果尚未达到生产目标,因此提高产量的因素之一是需要改善不符合AASHTO(美国国家公路和运输官员协会)标准和第1827/K/30/MEM/2018号部长级法令的矿山道路的几何形状。在实际矿山道路几何条件下,直线道路平均宽度为8.25米,弯道道路平均宽度为7.27米。对道路的坡度(坡度)在理论条件下获得了0% - 21.22%的值。对矿山道路进行几何形态修复后,输送产值为1692912亿立方米/月。有了这个值,生产就会增加,从而达到公司所期望的生产目标。关键词:AASHTO,周期时间,道路几何,生产。Abstrak。PT Silva Andia Utama merupakan salah satu perusahaan penambangan batu andesit yang terletak di Desa Giriasih, Kecamatan Batujajar, Kabupaten万隆巴拉特,爪哇巴拉特省。Tidak tercapainya目标产品为sebesar 15.292,8 BCM/bulan menjadi permasalahan di perusahaan ini, dimana salah satu faktornya adalah几何图形i jalan yang Tidak sesuai标准,seperti lebar jalan yang sempit mengakibatkan alat angkut Tidak bekerja secara最优,sehinga berpengaruh terhadap waktu edar aluhan tereset。Dari permasalahan tersebut, maka perlu dilakukannya perbaikan geometri jalan tambang untuk memaksimalkan keepatan paada alat angkut, sehinga waktu edar alat angkut turun dan producksi meningkat。美国国家公路和交通官员协会(AASHTO)第1827/K/30/MEM/2018号公告,yyitu mengenai geometri jalan meliputi lebar jalan kondisi lurus, lebar jalan kondisi tikungan, kemiringan jalan(坡度),jari-jari tikungan, kemiringan melintang(交叉坡度),dan superelevasi secara aktual。帕达卡吉安几何,加兰坦邦尼,kemudian dikaitkan dengan productksi alali -muat dankut untuk meningkatkan productsi penambangan batu和esit。Hasil penelitian ini mendapatkan产品,dalam keadaan实际产品,135,34,5 BCM/bulan。美国国家公路和交通官员协会(AASHTO)公报第1827/K/30/MEM/2018号。美国国家公路和交通官员协会。Pada kondisi aktual geometri jalan tambang untuk lebar jalan kondisi lurus rata-rata 8,25米丹untuk lebar jalan kondisi tikungan rata-rata 7,27米。帕达·克米林甘·贾兰(等级):帕达·克米林甘·贾兰(等级):0% - 21%,22%达拉姆·康迪西地区。Setelah dilakukan perbaikan geometri jalan tambang didapat nilai producksi alat angkut sebesar 16,929,12 BCM/bulan。登安nilai的目标产品有三种,一种是国产的,一种是国产的,一种是国产的,一种是国产的。Kata Kunci: AASHTO, Waktu Edar, Geometri Jalan, Produksi。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信