Choosing the Right Prioritisation Method

S. Hatton
{"title":"Choosing the Right Prioritisation Method","authors":"S. Hatton","doi":"10.1109/ASWEC.2008.22","DOIUrl":null,"url":null,"abstract":"There are many methods available for prioritising software requirements. Choosing the most suitable one can often be quite difficult. A number of factors need to be considered such as the project development methodology being used, the amount of time available, the amount of information known about requirements, the stage of the project and the degree of information about priority required. This paper examines the type of information available at different stages in a project and matches it to the properties of prioritisation methods. It then recommends the usage of specific prioritisation methods at certain stages of a project.","PeriodicalId":231903,"journal":{"name":"19th Australian Conference on Software Engineering (aswec 2008)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-03-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"49","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"19th Australian Conference on Software Engineering (aswec 2008)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASWEC.2008.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 49

Abstract

There are many methods available for prioritising software requirements. Choosing the most suitable one can often be quite difficult. A number of factors need to be considered such as the project development methodology being used, the amount of time available, the amount of information known about requirements, the stage of the project and the degree of information about priority required. This paper examines the type of information available at different stages in a project and matches it to the properties of prioritisation methods. It then recommends the usage of specific prioritisation methods at certain stages of a project.
选择正确的优先排序方法
有许多方法可用于划分软件需求的优先级。选择一个最合适的往往是相当困难的。需要考虑许多因素,例如正在使用的项目开发方法、可用的时间量、已知的需求信息量、项目的阶段和所需优先级信息的程度。本文考察了项目中不同阶段可用的信息类型,并将其与优先级方法的属性相匹配。然后,它建议在项目的特定阶段使用特定的优先级划分方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信