{"title":"Continuity of supply in power plant electrical auxiliaries in power system restoration strategy","authors":"J. Buchta","doi":"10.1109/EPQU.2011.6128851","DOIUrl":null,"url":null,"abstract":"The paper presents an analysis of the possibilities to improve power station contribution to the power system restoration. The modernization of an electrical auxiliaries system gives such possibilities. The results of computer simulations show the necessity to change an existing systems and adjust relays settings.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128851","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The paper presents an analysis of the possibilities to improve power station contribution to the power system restoration. The modernization of an electrical auxiliaries system gives such possibilities. The results of computer simulations show the necessity to change an existing systems and adjust relays settings.