{"title":"Aero-engine manufacturer - planning","authors":"M. Vencel, P. Korba, M. Hovanec, I. Vasilčin","doi":"10.1109/NTAD.2018.8551625","DOIUrl":null,"url":null,"abstract":"This paper highlights operations and supply problem in area aero-engine manufacturer planning. Research show inconsistent quality, extended lead times, economic changes and limited labor supply pose the greatest threat to aero-engine manufacturer posistion.","PeriodicalId":425929,"journal":{"name":"2018 XIII International Scientific Conference - New Trends in Aviation Development (NTAD)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 XIII International Scientific Conference - New Trends in Aviation Development (NTAD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NTAD.2018.8551625","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
This paper highlights operations and supply problem in area aero-engine manufacturer planning. Research show inconsistent quality, extended lead times, economic changes and limited labor supply pose the greatest threat to aero-engine manufacturer posistion.