{"title":"Application of Analytic Hierarchy Process (AHP) in load shedding scheme for electrical power system","authors":"Hui Hwang Goh, B. C. Kok","doi":"10.1109/EEEIC.2010.5489942","DOIUrl":null,"url":null,"abstract":"This paper proposes a methodology for the load shedding scheme for electrical power system by using the Analytic Hierarchy Process (AHP). The process AHP is a structured technique for dealing with complex decisions. In this paper, an effective method that can solve a multiple criteria and multiple objective decision-making problems was introduced to the load shedding scheme in electrical power system problem in order to gain a scientific and objective maintenance scheduling. Firstly an AHP model is built up on the base of analyzing correlative factors with an example given to indicate how the AHP is applied.","PeriodicalId":197298,"journal":{"name":"2010 9th International Conference on Environment and Electrical Engineering","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 9th International Conference on Environment and Electrical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEEIC.2010.5489942","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20
Abstract
This paper proposes a methodology for the load shedding scheme for electrical power system by using the Analytic Hierarchy Process (AHP). The process AHP is a structured technique for dealing with complex decisions. In this paper, an effective method that can solve a multiple criteria and multiple objective decision-making problems was introduced to the load shedding scheme in electrical power system problem in order to gain a scientific and objective maintenance scheduling. Firstly an AHP model is built up on the base of analyzing correlative factors with an example given to indicate how the AHP is applied.