Research on Quality Control of Reconstruction Project Based on TRIZ

Lingyun Qi, Jinkui Wang, Haoli Wang
{"title":"Research on Quality Control of Reconstruction Project Based on TRIZ","authors":"Lingyun Qi, Jinkui Wang, Haoli Wang","doi":"10.1109/ICDSBA48748.2019.00105","DOIUrl":null,"url":null,"abstract":"The transformation project is easy to be concealed. In engineering practice, the emergence of concealed works is mostly due to technical reasons, and the control measures in advance for concealed works are often insufficient. Aiming at these problems, this paper will build a quality control model of concealed works based on TRIZ, obtain a kind of control measures in advance, improve the content of technical preparation, in order to reduce the emergence of concealed works and solve the shortage of quality control. Finally, the model is applied to the quality control of the monitoring system transformation project of Chengdu detention center.","PeriodicalId":382429,"journal":{"name":"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 3rd International Conference on Data Science and Business Analytics (ICDSBA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDSBA48748.2019.00105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The transformation project is easy to be concealed. In engineering practice, the emergence of concealed works is mostly due to technical reasons, and the control measures in advance for concealed works are often insufficient. Aiming at these problems, this paper will build a quality control model of concealed works based on TRIZ, obtain a kind of control measures in advance, improve the content of technical preparation, in order to reduce the emergence of concealed works and solve the shortage of quality control. Finally, the model is applied to the quality control of the monitoring system transformation project of Chengdu detention center.
基于TRIZ的改造工程质量控制研究
改造工程容易隐蔽。在工程实践中,隐蔽工程的出现大多是由于技术原因,而对隐蔽工程的事前控制措施往往不足。针对这些问题,本文将构建基于TRIZ的隐蔽工程质量控制模型,提前获得一种控制措施,完善技术准备内容,以减少隐蔽工程的出现,解决质量控制的不足。最后,将该模型应用于成都市看守所监控系统改造工程的质量控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信