{"title":"Construction inspection guidelines","authors":"M. Norman","doi":"10.1109/REPCON.1989.95537","DOIUrl":null,"url":null,"abstract":"Guidelines are presented the purpose of which is to demonstrate a complete and systematic approach to the inspection of distribution line construction. The terminology of work order inspection (WOI) is oriented to the Rural Electric Administration (REA) program, but the basic methodology is applicable to other utilities. The primary objective of implementing a basic WOI system is quality control, but other benefits will also be realized as a result of the increased attention work.<<ETX>>","PeriodicalId":120857,"journal":{"name":"Papers Presented at the 33rd Annual Conference Rural Electric Power Conference","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Papers Presented at the 33rd Annual Conference Rural Electric Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.1989.95537","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Guidelines are presented the purpose of which is to demonstrate a complete and systematic approach to the inspection of distribution line construction. The terminology of work order inspection (WOI) is oriented to the Rural Electric Administration (REA) program, but the basic methodology is applicable to other utilities. The primary objective of implementing a basic WOI system is quality control, but other benefits will also be realized as a result of the increased attention work.<>