Factors Influencing Construction Time Delay on High Rise Projects in India

Saurav Dixit, Kaaraayaarthi Sharma
{"title":"Factors Influencing Construction Time Delay on High Rise Projects in India","authors":"Saurav Dixit, Kaaraayaarthi Sharma","doi":"10.3311/ccc2019-047","DOIUrl":null,"url":null,"abstract":"In Construction Project delay can be defined as the time over-run from the agreed upon a time which can be written & signed in the form of contract or verbal mutual agreement. Construction Projects often face delays and uses unnecessary time due to various factors and reasons, and hence suffer from unfavourable consequences. This study will identify the significant delay factors from an intensive literature review, supplemented by delay factors in major Indian construction projects based on empirical data. A total of eight ongoing construction projects were selected for the study. And a questionnaire is also used to collect reasons for the delay, their frequency, importance, and severity. 53 valid responses received from the project managers. SPSS 21 tool package is used for statistical analysis and the tests performed were Severity index and the correlation between the attributes. The findings of the study concluded that the maximum severity for delaying projects is due to Design Variation followed by Lack of Proper Planning, and Shortages of Skilled Labour. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-047","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

In Construction Project delay can be defined as the time over-run from the agreed upon a time which can be written & signed in the form of contract or verbal mutual agreement. Construction Projects often face delays and uses unnecessary time due to various factors and reasons, and hence suffer from unfavourable consequences. This study will identify the significant delay factors from an intensive literature review, supplemented by delay factors in major Indian construction projects based on empirical data. A total of eight ongoing construction projects were selected for the study. And a questionnaire is also used to collect reasons for the delay, their frequency, importance, and severity. 53 valid responses received from the project managers. SPSS 21 tool package is used for statistical analysis and the tests performed were Severity index and the correlation between the attributes. The findings of the study concluded that the maximum severity for delaying projects is due to Design Variation followed by Lack of Proper Planning, and Shortages of Skilled Labour. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
影响印度高层建筑工程施工延误的因素
在建设项目中,延迟可以定义为超过约定时间的时间,可以以合同或口头协议的形式书面签署。由于各种因素和原因,建设项目经常面临延误和使用不必要的时间,从而遭受不利后果。本研究将从密集的文献综述中确定重要的延迟因素,并根据经验数据补充印度主要建设项目的延迟因素。共有8个正在进行的建设项目被选为研究对象。并使用问卷收集延迟的原因,其频率,重要性和严重程度。从项目经理处收到53份有效回复。采用SPSS 21软件包进行统计分析,检验为严重性指数和各属性之间的相关性。该研究的结论是,延误项目的最大严重程度是由于设计变化,其次是缺乏适当的规划和熟练劳动力的短缺。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信