Implementation of Open Loop Testing Schemes for the Assessment of the Power System Dynamic Operation

F. Martínez-Cárdenas, A. Medina
{"title":"Implementation of Open Loop Testing Schemes for the Assessment of the Power System Dynamic Operation","authors":"F. Martínez-Cárdenas, A. Medina","doi":"10.1109/PCT.2007.4538341","DOIUrl":null,"url":null,"abstract":"This contribution highlights the importance of the implementation of open loop testing schemes in the assessment of the power system operation. These testing schemes can be used to solve most of the needs related to the assessment of the power system dynamic operation and can be applied in a simple way and at low cost, in comparison with closed loop schemes that require the use of an expensive real-time simulator. It is not intended in this contribution to minimize the importance of the realtime simulators but just highlight the importance of the open loop testing schemes.","PeriodicalId":356805,"journal":{"name":"2007 IEEE Lausanne Power Tech","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Lausanne Power Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCT.2007.4538341","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This contribution highlights the importance of the implementation of open loop testing schemes in the assessment of the power system operation. These testing schemes can be used to solve most of the needs related to the assessment of the power system dynamic operation and can be applied in a simple way and at low cost, in comparison with closed loop schemes that require the use of an expensive real-time simulator. It is not intended in this contribution to minimize the importance of the realtime simulators but just highlight the importance of the open loop testing schemes.
电力系统动态运行评估开环测试方案的实施
这一贡献突出了在电力系统运行评估中实施开环测试方案的重要性。这些测试方案可用于解决与电力系统动态运行评估有关的大多数需求,与需要使用昂贵的实时模拟器的闭环方案相比,这些测试方案可以以简单的方式和低成本应用。在这篇文章中,并不是要最小化实时模拟器的重要性,而是要强调开环测试方案的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信