Solving of transmission network development tasks in market and uncertainty conditions

I. Moshkin, S. Berjozkina, A. Sauhats
{"title":"Solving of transmission network development tasks in market and uncertainty conditions","authors":"I. Moshkin, S. Berjozkina, A. Sauhats","doi":"10.1109/EEM.2012.6254750","DOIUrl":null,"url":null,"abstract":"This paper is dedicated to the task of planning energy supply systems in the market environment. The possibilities of forming coalitions between companies are considered. In this case, for justifying the decisions and distributing the gains a cooperative game theory is used. Methods of forming a coalition and distributing additional gains are described in this paper. The example with the proposed strategy is based on a real project of 330 kV and 110kV high voltage lines between two substations and show the rationality and efficiency of using the considered approach.","PeriodicalId":383754,"journal":{"name":"2012 9th International Conference on the European Energy Market","volume":"90 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 9th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2012.6254750","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

This paper is dedicated to the task of planning energy supply systems in the market environment. The possibilities of forming coalitions between companies are considered. In this case, for justifying the decisions and distributing the gains a cooperative game theory is used. Methods of forming a coalition and distributing additional gains are described in this paper. The example with the proposed strategy is based on a real project of 330 kV and 110kV high voltage lines between two substations and show the rationality and efficiency of using the considered approach.
解决市场和不确定条件下的输电网开发任务
本文主要研究市场环境下的能源供应系统规划问题。考虑了公司之间形成联盟的可能性。在这种情况下,为了证明决策和分配收益的合理性,使用了合作博弈论。本文描述了联盟的形成和额外收益的分配方法。最后以一个330 kV和110kV变电站间高压线路的实际工程为例,说明了该方法的合理性和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信