{"title":"Matters of management of the investment-and-construction project cost in modern conditions","authors":"A. Pavlova","doi":"10.33920/str-01-2301-02","DOIUrl":null,"url":null,"abstract":"The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2301-02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.