Matters of management of the investment-and-construction project cost in modern conditions

A. Pavlova
{"title":"Matters of management of the investment-and-construction project cost in modern conditions","authors":"A. Pavlova","doi":"10.33920/str-01-2301-02","DOIUrl":null,"url":null,"abstract":"The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2301-02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.
现代条件下投资建设项目造价管理问题
考虑到项目融资的发展,作者根据项目生命周期的各个阶段和投资活动的主体对风险进行了扩展分类。高质量地编制设计概算和施工合同;担保的适用;限制;套期保值;保险;使用项目公司专用结算账户,严格控制项目资金用途(托管账户);其他可以减少负面后果发生的可能性的工具被认为是最小化风险和防范风险的最有效工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信