Simulation of Construction Project Duration

R. I. Carr
{"title":"Simulation of Construction Project Duration","authors":"R. I. Carr","doi":"10.1061/JCCEAZ.0000827","DOIUrl":null,"url":null,"abstract":"MUD (model for uncertainty determination) will simulate the progress under uncertainty of the typical construction project on which the activity durations are not independent of each other. Monte Carlo simulation models the effects of uncertainties that are independent of calendar date. Daily progress under uncertain weather is simulated using historical weather data. Activity criticalities are computed for the simulated activity times. The samples from multiple simulations of a project are combined by MUD to calculate a range estimate (mean and standard duration) for activity and project durations, times, and criticality. A small example project illustrates some of the capabilities of MUD.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"67","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000827","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 67

Abstract

MUD (model for uncertainty determination) will simulate the progress under uncertainty of the typical construction project on which the activity durations are not independent of each other. Monte Carlo simulation models the effects of uncertainties that are independent of calendar date. Daily progress under uncertain weather is simulated using historical weather data. Activity criticalities are computed for the simulated activity times. The samples from multiple simulations of a project are combined by MUD to calculate a range estimate (mean and standard duration) for activity and project durations, times, and criticality. A small example project illustrates some of the capabilities of MUD.
建设项目工期模拟
MUD(不确定性确定模型)将模拟不确定性下的典型建设项目的进度,其中活动持续时间彼此不是独立的。蒙特卡罗模拟模拟与日历日期无关的不确定性的影响。利用历史天气资料模拟不确定天气下的每日进度。根据模拟的活动时间计算活动临界度。从一个项目的多个模拟中得到的样本通过MUD组合来计算活动和项目持续时间、时间和临界性的范围估计(平均和标准持续时间)。一个小的示例项目说明了MUD的一些功能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信