Improving Agile Planning for Reliable Software Delivery

Jirat Pasuksmit, Fan Jiang, Kemp Thornton, A. Friedman, Natalija Fuksmane, Isabelle Kohout, Julian Connor
{"title":"Improving Agile Planning for Reliable Software Delivery","authors":"Jirat Pasuksmit, Fan Jiang, Kemp Thornton, A. Friedman, Natalija Fuksmane, Isabelle Kohout, Julian Connor","doi":"10.1109/MSR59073.2023.00017","DOIUrl":null,"url":null,"abstract":"Agile software development prioritizes the delivery of working software. However, there are challenges in the sprint planning process that could impact the reliability of sprint delivery. In this paper, we list three challenges related to the sprint planning process. We also discuss future work directions to facilitate the sprint planning process and mitigate those challenges for software teams.","PeriodicalId":317960,"journal":{"name":"2023 IEEE/ACM 20th International Conference on Mining Software Repositories (MSR)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 IEEE/ACM 20th International Conference on Mining Software Repositories (MSR)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MSR59073.2023.00017","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Agile software development prioritizes the delivery of working software. However, there are challenges in the sprint planning process that could impact the reliability of sprint delivery. In this paper, we list three challenges related to the sprint planning process. We also discuss future work directions to facilitate the sprint planning process and mitigate those challenges for software teams.
改进敏捷计划,实现可靠的软件交付
敏捷软件开发优先考虑工作软件的交付。然而,在冲刺计划过程中存在一些挑战,这些挑战可能会影响冲刺交付的可靠性。在本文中,我们列出了与sprint计划过程相关的三个挑战。我们还讨论了未来的工作方向,以促进sprint计划过程,并减轻软件团队面临的挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信