New start-up schemes for isolated full-bridge boost converters

Lizhi Zhu, Kunrong Wang, F. C. Lee, J. Lai
{"title":"New start-up schemes for isolated full-bridge boost converters","authors":"Lizhi Zhu, Kunrong Wang, F. C. Lee, J. Lai","doi":"10.1109/APEC.2000.826120","DOIUrl":null,"url":null,"abstract":"Two new start-up schemes for isolated full-bridge boost converters are proposed in this paper. The control timing for each scheme, which is compatible with the PWM control timing for the normal boost mode operation, is investigated. Design considerations on the relationships between the turns ratios of the boost choke windings and the main transformer windings, and its effects on the operation of the converter, are studied. The two proposed start-up schemes are experimentally verified on a 1.6 kW, 12 V/288 V prototype.","PeriodicalId":347959,"journal":{"name":"APEC 2000. Fifteenth Annual IEEE Applied Power Electronics Conference and Exposition (Cat. No.00CH37058)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-02-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"115","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"APEC 2000. Fifteenth Annual IEEE Applied Power Electronics Conference and Exposition (Cat. No.00CH37058)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APEC.2000.826120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 115

Abstract

Two new start-up schemes for isolated full-bridge boost converters are proposed in this paper. The control timing for each scheme, which is compatible with the PWM control timing for the normal boost mode operation, is investigated. Design considerations on the relationships between the turns ratios of the boost choke windings and the main transformer windings, and its effects on the operation of the converter, are studied. The two proposed start-up schemes are experimentally verified on a 1.6 kW, 12 V/288 V prototype.
隔离式全桥升压变换器的新启动方案
本文提出了两种新的隔离型全桥升压变换器启动方案。研究了每种方案的控制时序,使其与正常升压模式下的PWM控制时序相兼容。研究了升压扼流圈绕组匝数比与主变压器绕组匝数比之间的关系及其对变换器运行的影响。在一个1.6 kW, 12 V/288 V的样机上实验验证了这两种启动方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信