PENJADWALAN PROYEK PERUMAHAN X BINTARO DENGAN METODE LINE OF BALANCE YANG DISEMPURNAKAN

A. Timothy, Onnyxiforus Gondokusumo
{"title":"PENJADWALAN PROYEK PERUMAHAN X BINTARO DENGAN METODE LINE OF BALANCE YANG DISEMPURNAKAN","authors":"A. Timothy, Onnyxiforus Gondokusumo","doi":"10.24912/jmstkik.v6i2.16927","DOIUrl":null,"url":null,"abstract":"In a project with repetitive activities, traditional scheduling methods like barchart are considered less effective to be used. So it would be better if using a special scheduling method . The commonly used method is line of balance and flowline. In its application, the two methods have several obstacles, both from a technical and visual perspective. Technically, the line of balance method will arrange workers with shifted time that is not effective. Visually, the flowline method cannot directly inform the duration of a project. This research will be using line of balance scheduling method and an enchanced line of balance scheduling method, which is improved both from a technical and visual perspective. Technically, the preparation is done using 3 steps; (1) Line of Balance (LOB) formulation, (2) interruption calculation, and (3) First-Come First Serve (FCFS. While visually, duration-distance chart (DD-Chart) is used to combine the advantages of the two existing methods, which is line of balance and flowline. This study uses housing project X in Bintaro to be the object of research with a total of 6 housing units. Based on the result of the research, the duration of the project with line of balance method is 353 days, and 336 days with enhanced repetitive scheduling method. The reduction of the project duration keeps using the same amount of man-days.\nKeywords: LOB; scheduling; FCFS; DD-Chart;  repetitive scheduling\nAbstrak\nPada suatu proyek dengan pekerjaan berulang (repetitive), penjadwalan dengan metode biasa seperti barchart tidak efektif untuk digunakan. Sehingga lebih baik digunakan suatu metode penjadwalan yang khusus. Metode yang digunakan biasanya adalah metode line of balance dan flowline. Pada penerapannya, kedua metode tersebut terdapat beberapa kendala baik dari segi teknis maupun visual. Dari segi teknis, metode line of balance akan menyusun pekerja dengan adanya waktu geser yang tidak efektif. Sedangkan dari segi visual, metode flowline tidak dapat secara langsung menginformasikan durasi dari suatu proyek. Pada penelitian ini, akan dikaji suatu metode penjadwalan dengan metode line of balance dan metode line of balance yang disempurnakan baik dari segi teknis dan visual. Secara teknis, penyusunan dilakukan dengan menggunakan 3 langkah; (1) Formulasi Line of Balance (LOB), (2) Perhitungan interupsi, dan (3) First-Come First-Serve (FCFS). Sedangkan secara visual,  digunakan grafik duration-distance chart (DD-Chart) untuk mengkombinasikan keunggulan dari dua metode yang sudah ada, yaitu line of balance dan flowline. Penelitian ini menggunakan proyek perumahan X di Bintaro untuk dijadikan obyek penelitian dengan jumlah unit sebanyak 6 unit rumah. Berdasarkan hasil penelitian, diperoleh durasi penjadwalan sebesar 353 hari dengan metode line of balance, serta 336 hari dengan metode line of balance yang disempurnakan. Pengurangan durasi tersebut tetap menggunakan jumlah orang-hari yang sama.","PeriodicalId":202016,"journal":{"name":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24912/jmstkik.v6i2.16927","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In a project with repetitive activities, traditional scheduling methods like barchart are considered less effective to be used. So it would be better if using a special scheduling method . The commonly used method is line of balance and flowline. In its application, the two methods have several obstacles, both from a technical and visual perspective. Technically, the line of balance method will arrange workers with shifted time that is not effective. Visually, the flowline method cannot directly inform the duration of a project. This research will be using line of balance scheduling method and an enchanced line of balance scheduling method, which is improved both from a technical and visual perspective. Technically, the preparation is done using 3 steps; (1) Line of Balance (LOB) formulation, (2) interruption calculation, and (3) First-Come First Serve (FCFS. While visually, duration-distance chart (DD-Chart) is used to combine the advantages of the two existing methods, which is line of balance and flowline. This study uses housing project X in Bintaro to be the object of research with a total of 6 housing units. Based on the result of the research, the duration of the project with line of balance method is 353 days, and 336 days with enhanced repetitive scheduling method. The reduction of the project duration keeps using the same amount of man-days. Keywords: LOB; scheduling; FCFS; DD-Chart;  repetitive scheduling Abstrak Pada suatu proyek dengan pekerjaan berulang (repetitive), penjadwalan dengan metode biasa seperti barchart tidak efektif untuk digunakan. Sehingga lebih baik digunakan suatu metode penjadwalan yang khusus. Metode yang digunakan biasanya adalah metode line of balance dan flowline. Pada penerapannya, kedua metode tersebut terdapat beberapa kendala baik dari segi teknis maupun visual. Dari segi teknis, metode line of balance akan menyusun pekerja dengan adanya waktu geser yang tidak efektif. Sedangkan dari segi visual, metode flowline tidak dapat secara langsung menginformasikan durasi dari suatu proyek. Pada penelitian ini, akan dikaji suatu metode penjadwalan dengan metode line of balance dan metode line of balance yang disempurnakan baik dari segi teknis dan visual. Secara teknis, penyusunan dilakukan dengan menggunakan 3 langkah; (1) Formulasi Line of Balance (LOB), (2) Perhitungan interupsi, dan (3) First-Come First-Serve (FCFS). Sedangkan secara visual,  digunakan grafik duration-distance chart (DD-Chart) untuk mengkombinasikan keunggulan dari dua metode yang sudah ada, yaitu line of balance dan flowline. Penelitian ini menggunakan proyek perumahan X di Bintaro untuk dijadikan obyek penelitian dengan jumlah unit sebanyak 6 unit rumah. Berdasarkan hasil penelitian, diperoleh durasi penjadwalan sebesar 353 hari dengan metode line of balance, serta 336 hari dengan metode line of balance yang disempurnakan. Pengurangan durasi tersebut tetap menggunakan jumlah orang-hari yang sama.
用精细的平衡线方案规划住房项目
在具有重复性活动的项目中,传统的排程方法(如条形图)被认为效率较低。因此,如果采用一种特殊的调度方法,效果会更好。常用的方法是平衡线和流线。在应用中,这两种方法在技术和视觉上都存在一些障碍。从技术上讲,平衡线法会安排轮班的工人,这是无效的。从视觉上看,流水线方法不能直接告知项目的持续时间。本研究将使用平衡线调度方法和一种增强的平衡线调度方法,该方法从技术和视觉两方面进行了改进。从技术上讲,准备工作分为三个步骤;(1)平衡线(LOB)公式,(2)中断计算,(3)先到先得。在视觉上,利用持续距离图(DD-Chart)结合了平衡线和流线两种现有方法的优点。本研究以滨太郎市X住宅项目为研究对象,共6个住宅单元。根据研究结果,平衡线法的项目工期为353天,强化重复调度法的项目工期为336天。项目工期的缩短使使用的工日保持不变。关键词:LOB;调度;先;DD-Chart;【摘要】重复调度(pada suatu proyek dengan pekerjaan berulang),重复调度(penjadwalan dengan)方法偏向于分离柱状图,重复调度的效果优于重复调度。seingga lebih baik digunakan suatu方法penjadwalan yang khusus。Metode yang diunakan biasanya adalah Metode line平衡丹流线。padpaderapannya, kedua medede tersepatat beberapa kendala baik dari segi teknis maupun visual。达里segi teknis,方法平衡线akan menyusun pekerja dengan adanya waktu geser yang tidak ektif。Sedangkan dari segi visual,方法流水线,潮汐线,潮汐线,潮汐线,潮汐线,潮汐线,潮汐线,潮汐线。padadpenelitian ini, akan dikaji suatu方法penjadwalan dengan方法平衡线penjadwalan平衡线yang disempurnakan baik dari segi teknis dan visual。Secara teknis, penyusunan dilakukan dengan menggunakan 3 langkah;(1)公式平衡线(LOB), (2) Perhitungan中断,丹(3)先到先得(FCFS)。Sedangkan secara visual, digunakan grafik duration-distance chart (DD-Chart) untuk mengkombinasikan keungulan dari dua mede yang sudah ada, yitu line of balance dan flowline。Penelitian ini menggunakan proyek perumahan X di Bintaro untuk dijadikan obyek Penelitian dengan jumlah unit sebanyak 6 unit rumah。Berdasarkan hasil penelitian, diperoleh durasi penjadwalan sebesar 353 hari dengan方法平衡线,serta 336 hari dengan方法平衡线yang disempurnakan。Pengurangan durasi tersebut tetap menggunakan jumlah orange -hari yang sama。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信