The Statutory Scheme

The Rt Hon. Lord Justice Coulson
{"title":"The Statutory Scheme","authors":"The Rt Hon. Lord Justice Coulson","doi":"10.1093/oso/9780198822110.003.0005","DOIUrl":null,"url":null,"abstract":"The Scheme is designed as a fall-back position; if the construction contract in question does not contain the adjudication provisions set out in s108, or if it does not include the payment provisions set out in s109 of the 1996 Act, then the provisions of the Scheme apply as implied terms of the contract (s114(4)). Although many of the standard forms of construction and engineering contracts now contain specific adjudication and payment provisions that comply with the Act, so the parties do not need to have regard to the Scheme, there are many construction contracts, particularly for smaller works, which do not contain such provisions.","PeriodicalId":434490,"journal":{"name":"Coulson on Construction Adjudication","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Coulson on Construction Adjudication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198822110.003.0005","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Scheme is designed as a fall-back position; if the construction contract in question does not contain the adjudication provisions set out in s108, or if it does not include the payment provisions set out in s109 of the 1996 Act, then the provisions of the Scheme apply as implied terms of the contract (s114(4)). Although many of the standard forms of construction and engineering contracts now contain specific adjudication and payment provisions that comply with the Act, so the parties do not need to have regard to the Scheme, there are many construction contracts, particularly for smaller works, which do not contain such provisions.
法定计划
该方案被设计为一个后备位置;如果有关的建筑合同不包含第108条规定的裁决条款,或者如果它不包括1996年法案第109条规定的付款条款,则计划的条款作为合同的默示条款适用(第114(4)条)。虽然现在许多标准形式的建筑和工程合同都包含符合该法案的具体裁决和付款条款,因此当事人不必考虑该计划,但仍有许多建筑合同,特别是小型工程的建筑合同,没有包含此类条款。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信