Automatic Verification of Facilities Management Handover Building Information Models

Marjan Sadeghi, Jonathan W. Elliott, M. Mehany
{"title":"Automatic Verification of Facilities Management Handover Building Information Models","authors":"Marjan Sadeghi, Jonathan W. Elliott, M. Mehany","doi":"10.1061/9780784482865.052","DOIUrl":null,"url":null,"abstract":"Although Building Information Models (BIM) are increasingly recognized as a compelling tool for project delivery, the challenges of seamless model validation and the transition of BIM data to FM remains unresolved. BIM data interoperability issues, lack of a clear understanding of owner’s Exchange Requirements (ERs), inconsistent syntax in developing discipline-specific models, and software limitations contribute to the difficulty of using Architecture, Engineering, and Construction-purposed BIMs for FM handover. This research explores a case-based example of implementing computational BIM for automatic verification of an FM-handover BIM at project close out. The relationships between, and properties of, model objects used to capture the required geometric and non-geometric information for the owner’s FM handover needs is specified in accordance with the applicable IFC entities. The syntax of the model is formalized in conjunction with the buildingSMART Data Dictionary (bsDD) schema. Dynamo is used as a visual programming platform to work with the Autodesk Revit Application Programming Interface (API) to extend its parametric capabilities to verify the BIM data in compliance with the specified requirements. The results of the automated verification procedure highlight completeness, uniqueness, correctness, usefulness, and unambiguity of BIM data as critical quality dimensions for the purpose of project delivery.","PeriodicalId":322194,"journal":{"name":"Construction Research Congress 2020","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Research Congress 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784482865.052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Although Building Information Models (BIM) are increasingly recognized as a compelling tool for project delivery, the challenges of seamless model validation and the transition of BIM data to FM remains unresolved. BIM data interoperability issues, lack of a clear understanding of owner’s Exchange Requirements (ERs), inconsistent syntax in developing discipline-specific models, and software limitations contribute to the difficulty of using Architecture, Engineering, and Construction-purposed BIMs for FM handover. This research explores a case-based example of implementing computational BIM for automatic verification of an FM-handover BIM at project close out. The relationships between, and properties of, model objects used to capture the required geometric and non-geometric information for the owner’s FM handover needs is specified in accordance with the applicable IFC entities. The syntax of the model is formalized in conjunction with the buildingSMART Data Dictionary (bsDD) schema. Dynamo is used as a visual programming platform to work with the Autodesk Revit Application Programming Interface (API) to extend its parametric capabilities to verify the BIM data in compliance with the specified requirements. The results of the automated verification procedure highlight completeness, uniqueness, correctness, usefulness, and unambiguity of BIM data as critical quality dimensions for the purpose of project delivery.
设施管理交接楼宇信息模型的自动验证
尽管建筑信息模型(BIM)越来越被认为是项目交付的一个引人注目的工具,但无缝模型验证和BIM数据向FM过渡的挑战仍未解决。BIM数据互操作性问题,缺乏对业主交换需求(er)的清晰理解,开发特定学科模型时语法不一致,以及软件限制,都导致了在FM移交中使用架构、工程和施工目的BIM的困难。本研究探讨了在项目结束时实现计算BIM以自动验证fm移交BIM的案例示例。模型对象之间的关系和属性是根据适用的IFC实体指定的,模型对象用于捕获所有者FM移交所需的几何和非几何信息。模型的语法与buildingSMART数据字典(bsDD)模式一起形式化。Dynamo被用作可视化编程平台,与Autodesk Revit应用程序编程接口(API)一起工作,扩展其参数化功能,以验证BIM数据是否符合指定要求。自动化验证过程的结果突出了BIM数据的完整性、唯一性、正确性、有用性和无歧义性,这些都是项目交付的关键质量维度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信