РИЗИК-МЕНЕДЖМЕНТ ВОЛОНТЕРСЬКИХ ПРОЄКТІВ

Тетяна Бондарєва
{"title":"РИЗИК-МЕНЕДЖМЕНТ ВОЛОНТЕРСЬКИХ ПРОЄКТІВ","authors":"Тетяна Бондарєва","doi":"10.32620/cher.2023.1.10","DOIUrl":null,"url":null,"abstract":"The question of the organization of charitable activities in Ukraine was considered, the specifics of volunteering in modern conditions were determined. The need for risk management in volunteer projects is emphasized. The purpose of the article is to review the theoretical foundations and develop practical recommendations for risk management of volunteer projects. The methodological basis of the research was logical methods of information processing, methods of analysis for identifying project risks, an abstract-logical method for formulating recommendations and conclusions. Presenting main material. The theoretical and methodological principles of charitable activities in Ukraine are considered. The specifics of implementing volunteer projects were analyzed and their risks were identified. It was determined that they are characterized by external risks associated with legislation, the search for donors, communication links, etc., and internal risks, which can include motivational risks, risks associated with compliance with the requirements of the \"project triangle\", and the risks of project participants. The risks of volunteer projects have been identified. Project risk management measures are proposed, the implementation of which will make it possible to prevent the occurrence of a risky situation or reduce its negative impact on the achievement of project goals. The originality and practical significance of the research is confirmed by the possibility of using the proposed measures as a practical risk management tool for planning volunteer projects. Conclusions and prospects for further research. The proposed identification of project risks and recommendations for their management can be used to further improve the risk management processes of volunteer projects by creating simulation models for evaluating the quantitative characteristics of adverse events.","PeriodicalId":268092,"journal":{"name":"TIME DESCRIPTION OF ECONOMIC REFORMS","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"TIME DESCRIPTION OF ECONOMIC REFORMS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32620/cher.2023.1.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The question of the organization of charitable activities in Ukraine was considered, the specifics of volunteering in modern conditions were determined. The need for risk management in volunteer projects is emphasized. The purpose of the article is to review the theoretical foundations and develop practical recommendations for risk management of volunteer projects. The methodological basis of the research was logical methods of information processing, methods of analysis for identifying project risks, an abstract-logical method for formulating recommendations and conclusions. Presenting main material. The theoretical and methodological principles of charitable activities in Ukraine are considered. The specifics of implementing volunteer projects were analyzed and their risks were identified. It was determined that they are characterized by external risks associated with legislation, the search for donors, communication links, etc., and internal risks, which can include motivational risks, risks associated with compliance with the requirements of the "project triangle", and the risks of project participants. The risks of volunteer projects have been identified. Project risk management measures are proposed, the implementation of which will make it possible to prevent the occurrence of a risky situation or reduce its negative impact on the achievement of project goals. The originality and practical significance of the research is confirmed by the possibility of using the proposed measures as a practical risk management tool for planning volunteer projects. Conclusions and prospects for further research. The proposed identification of project risks and recommendations for their management can be used to further improve the risk management processes of volunteer projects by creating simulation models for evaluating the quantitative characteristics of adverse events.
审议了在乌克兰组织慈善活动的问题,确定了现代条件下志愿活动的具体情况。强调了志愿者项目风险管理的必要性。本文旨在回顾志愿者项目风险管理的理论基础,并提出实践建议。研究的方法论基础是信息处理的逻辑方法、识别项目风险的分析方法、提出建议和结论的抽象逻辑方法。呈现主要材料。考虑了乌克兰慈善活动的理论和方法原则。分析了实施志愿者项目的细节,并确定了其风险。经确定,它们的特点是与立法、寻找捐助者、沟通联系等有关的外部风险和内部风险,其中可包括动机风险、与遵守“项目三角”要求有关的风险和项目参与者的风险。志愿者项目的风险已经被确定。提出了项目风险管理措施,实施这些措施可以防止风险情况的发生或减少其对项目目标实现的负面影响。通过将所提出的测度方法作为一种实用的风险管理工具来规划志愿者项目,证实了本研究的独创性和现实意义。结论及进一步研究的展望。提出的项目风险识别和管理建议可以通过创建模拟模型来评估不良事件的定量特征,从而进一步改进志愿者项目的风险管理流程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信