The Objective Evaluation of Highway Construction Project Based on Revised Logic Framework Approach

Li Lin, Guo Wenjie, Du Peng
{"title":"The Objective Evaluation of Highway Construction Project Based on Revised Logic Framework Approach","authors":"Li Lin, Guo Wenjie, Du Peng","doi":"10.1109/ICIII.2008.36","DOIUrl":null,"url":null,"abstract":"This paper provides highway construction object-evaluation index system and establishes a revised LFA of project object-evaluation from the LFApsilas four-level cause and effect relation. We utilize AHP to compute index weight and obtain the qualitative index values by using contrast method and expertspsila opinions and then decide a membershippsilas degree. To get the quantitative indexes, the triangle-fuzzy-number method is applied to decide a membershippsilas degree and fuzzy comprehensive evaluation model is established to decide how a highway construction project is carried out. Finally we provide an empirical test for our method by studying Chang-Tan Highway construction in details. It is shown that Chang-Tan Highway project is perfect with a score of 81.18.","PeriodicalId":185591,"journal":{"name":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIII.2008.36","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This paper provides highway construction object-evaluation index system and establishes a revised LFA of project object-evaluation from the LFApsilas four-level cause and effect relation. We utilize AHP to compute index weight and obtain the qualitative index values by using contrast method and expertspsila opinions and then decide a membershippsilas degree. To get the quantitative indexes, the triangle-fuzzy-number method is applied to decide a membershippsilas degree and fuzzy comprehensive evaluation model is established to decide how a highway construction project is carried out. Finally we provide an empirical test for our method by studying Chang-Tan Highway construction in details. It is shown that Chang-Tan Highway project is perfect with a score of 81.18.
基于修正逻辑框架法的公路建设项目客观评价
本文提出了公路建设目标评价指标体系,并从项目目标评价的四个层次因果关系出发,建立了一个修正的项目目标评价的目标分析模型。运用层次分析法计算指标权重,通过对比法和专家意见得到定性指标值,确定隶属度。为得到定量指标,采用三角模糊数法确定隶属度,建立模糊综合评价模型,确定公路建设项目的实施方式。最后,以长滩公路建设为例,对本文方法进行了实证检验。结果表明,长滩公路项目是完善的,得分为81.18。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信