{"title":"The Objective Evaluation of Highway Construction Project Based on Revised Logic Framework Approach","authors":"Li Lin, Guo Wenjie, Du Peng","doi":"10.1109/ICIII.2008.36","DOIUrl":null,"url":null,"abstract":"This paper provides highway construction object-evaluation index system and establishes a revised LFA of project object-evaluation from the LFApsilas four-level cause and effect relation. We utilize AHP to compute index weight and obtain the qualitative index values by using contrast method and expertspsila opinions and then decide a membershippsilas degree. To get the quantitative indexes, the triangle-fuzzy-number method is applied to decide a membershippsilas degree and fuzzy comprehensive evaluation model is established to decide how a highway construction project is carried out. Finally we provide an empirical test for our method by studying Chang-Tan Highway construction in details. It is shown that Chang-Tan Highway project is perfect with a score of 81.18.","PeriodicalId":185591,"journal":{"name":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Information Management, Innovation Management and Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIII.2008.36","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
Abstract
This paper provides highway construction object-evaluation index system and establishes a revised LFA of project object-evaluation from the LFApsilas four-level cause and effect relation. We utilize AHP to compute index weight and obtain the qualitative index values by using contrast method and expertspsila opinions and then decide a membershippsilas degree. To get the quantitative indexes, the triangle-fuzzy-number method is applied to decide a membershippsilas degree and fuzzy comprehensive evaluation model is established to decide how a highway construction project is carried out. Finally we provide an empirical test for our method by studying Chang-Tan Highway construction in details. It is shown that Chang-Tan Highway project is perfect with a score of 81.18.