{"title":"Failure of a PVC Water-Filter Housing","authors":"","doi":"10.31399/asm.fach.process.c0090909","DOIUrl":null,"url":null,"abstract":"\n An injection-molded PVC water-filter housing fractured in service. 75x views and visual inspection supported the conclusion that failure occurred due to fatigue crack propagation, as indicated by the presence of discontinuous crack-growth bands and their evolution. However, an initial fissure was believed to have started first due to residual stresses developed during injection molding. No recommendations were made.","PeriodicalId":294593,"journal":{"name":"ASM Failure Analysis Case Histories: Processing Errors and Defects","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASM Failure Analysis Case Histories: Processing Errors and Defects","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31399/asm.fach.process.c0090909","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
An injection-molded PVC water-filter housing fractured in service. 75x views and visual inspection supported the conclusion that failure occurred due to fatigue crack propagation, as indicated by the presence of discontinuous crack-growth bands and their evolution. However, an initial fissure was believed to have started first due to residual stresses developed during injection molding. No recommendations were made.