{"title":"Substation expansion planning in Kulon progo region using imperialist competitive algorithm","authors":"Sarjiya, Tiyono, Beny Septian Pardede","doi":"10.1109/ICITEED.2017.8250512","DOIUrl":null,"url":null,"abstract":"The objective of substation expansion planning (SEP) is to prepare the capacity of a substation in order to supply the load growth in the future. The planning is conducted also to minimize the investment and operation cost of the substation, by finding its optimal location, capacity, and construction time. This paper proposes SEP using an imperialist competitive algorithm (ICA) and geographical information system (GIS). The type of planning is one stage, with 10 years period time (long-term). Two alternatives of SEP, which are the expansion of existing substation and the construction of a new substation in the new location are analyzed and compared. The alternative with a lower cost without breaking the constraints is taken. The effect of ICA parameters is also tested to find the best optimum value and the fastest execution time. Finally, the comparison between ICA and Genetic Algorithm (GA) is done to prove the effectiveness of the method in the SEP.","PeriodicalId":267403,"journal":{"name":"2017 9th International Conference on Information Technology and Electrical Engineering (ICITEE)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 9th International Conference on Information Technology and Electrical Engineering (ICITEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITEED.2017.8250512","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The objective of substation expansion planning (SEP) is to prepare the capacity of a substation in order to supply the load growth in the future. The planning is conducted also to minimize the investment and operation cost of the substation, by finding its optimal location, capacity, and construction time. This paper proposes SEP using an imperialist competitive algorithm (ICA) and geographical information system (GIS). The type of planning is one stage, with 10 years period time (long-term). Two alternatives of SEP, which are the expansion of existing substation and the construction of a new substation in the new location are analyzed and compared. The alternative with a lower cost without breaking the constraints is taken. The effect of ICA parameters is also tested to find the best optimum value and the fastest execution time. Finally, the comparison between ICA and Genetic Algorithm (GA) is done to prove the effectiveness of the method in the SEP.
利用帝国主义竞争算法进行库伦普罗戈地区变电站扩建规划
变电站扩建规划(SEP)的目标是准备变电站的容量,以满足未来负荷的增长。通过找到变电站的最佳位置、容量和建设时间,进行规划以最大限度地减少变电站的投资和运行成本。本文提出了基于帝国主义竞争算法(ICA)和地理信息系统(GIS)的SEP。规划类型为一个阶段,周期为10年(长期)。对现有变电站扩建和在新址新建变电站两种方案进行了分析比较。在不打破约束的情况下,选择成本较低的替代方案。为了找到最佳的最优值和最快的执行时间,还测试了ICA参数的影响。最后,通过与遗传算法(GA)的比较,验证了该方法在SEP中的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信