{"title":"Event based modelling and control of software development processes","authors":"Manfred Mauerkirchner","doi":"10.1109/ECBS.1997.581843","DOIUrl":null,"url":null,"abstract":"Traditionally software development is described by different process oriented models, so-called process models or v-models. Project management of the software development process requires a modified view which is achievable by aggregation of elementary building blocks of the selected v-model. We propose an approach which is independent of v-models and forms the basis of the development of a project management system which can be applied in real time. The usage of simulations during the entire project optimizes the assignment of resources and reduces the requirement of external decisions.","PeriodicalId":240356,"journal":{"name":"Proceedings International Conference and Workshop on Engineering of Computer-Based Systems","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-03-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings International Conference and Workshop on Engineering of Computer-Based Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECBS.1997.581843","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7
Abstract
Traditionally software development is described by different process oriented models, so-called process models or v-models. Project management of the software development process requires a modified view which is achievable by aggregation of elementary building blocks of the selected v-model. We propose an approach which is independent of v-models and forms the basis of the development of a project management system which can be applied in real time. The usage of simulations during the entire project optimizes the assignment of resources and reduces the requirement of external decisions.