{"title":"Study on DAS-Based Time Synchronization for Improving Reliability of Section Load Estimation","authors":"In-tae Lee, Ji-Hoon Lee, Nam-Joon Jung, Young-beom Jung, Byung-sung Lee","doi":"10.18770/KEPCO.2015.01.01.061","DOIUrl":null,"url":null,"abstract":"Abstract For effective distribution planning and operation, we need a reliable estimation of operation capacity. But it is difficult to ensure reliability due to the low accuracy of section load data, which is used as a basis in estimating the operation capacity. This paper discusses how to improve the accuracy of section load data by analyzing the existing method of estimating the section load, using statistical techniques to adjust the acquired data, and using the section load estimation algorithm to estimate the section load based on the adjusted data. Keywords : DAS, time synchronization, section load, estimation reliability I. INTRODUCTION It is essential to estimate the section load correctly considering the actual status of the line for distribution planning and operation. The existing method of estimating the section load data based on the distribution automation system is not correct and so it is only used for reference in operating the actual distribution systems. The data is not correct, because the useful voltage data is not acquired from the distribution switch and also because the current data is not time-synchronized at the switch and there are some missing data sections.This paper discusses how to improve the accuracy of section load data by analyzing the existing method of using the distribution automation system to estimate the section load and identify problems, using statistical techniques to adjust the acquired data, and using the section load estimation algorithm to estimate the section load based on the adjusted data [1].","PeriodicalId":445819,"journal":{"name":"KEPCO Journal on electric power and energy","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"KEPCO Journal on electric power and energy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18770/KEPCO.2015.01.01.061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract For effective distribution planning and operation, we need a reliable estimation of operation capacity. But it is difficult to ensure reliability due to the low accuracy of section load data, which is used as a basis in estimating the operation capacity. This paper discusses how to improve the accuracy of section load data by analyzing the existing method of estimating the section load, using statistical techniques to adjust the acquired data, and using the section load estimation algorithm to estimate the section load based on the adjusted data. Keywords : DAS, time synchronization, section load, estimation reliability I. INTRODUCTION It is essential to estimate the section load correctly considering the actual status of the line for distribution planning and operation. The existing method of estimating the section load data based on the distribution automation system is not correct and so it is only used for reference in operating the actual distribution systems. The data is not correct, because the useful voltage data is not acquired from the distribution switch and also because the current data is not time-synchronized at the switch and there are some missing data sections.This paper discusses how to improve the accuracy of section load data by analyzing the existing method of using the distribution automation system to estimate the section load and identify problems, using statistical techniques to adjust the acquired data, and using the section load estimation algorithm to estimate the section load based on the adjusted data [1].
基于das的时间同步提高分段负荷估计可靠性的研究
摘要为了有效地进行配电网规划和运行,需要对配电网运行容量进行可靠的估计。但区段负荷数据作为估算运行能力的依据,其准确性较低,难以保证可靠性。本文通过分析现有的分段负荷估计方法,利用统计技术对采集的数据进行调整,并利用分段负荷估计算法根据调整后的数据对分段负荷进行估计,探讨了如何提高分段负荷数据的准确性。关键词:DAS,时间同步,分段负荷,估计可靠性1 .引言考虑线路的实际状况,正确估计分段负荷对配电规划和运行至关重要。现有的基于配电自动化系统的分段负荷数据估算方法是不正确的,仅供实际配电系统运行时参考。数据不正确,因为有用的电压数据不是从配电开关获取的,也因为电流数据在开关处不是时间同步的,并且有一些缺失的数据部分。本文通过分析现有的利用配电自动化系统进行分段负荷估计和问题识别的方法,利用统计技术对采集的数据进行调整,利用分段负荷估计算法对调整后的数据进行分段负荷估计,探讨如何提高分段负荷数据的准确性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信