{"title":"Application of an inherently parallel heuristic methodology to flow-shop scheduling","authors":"I. Paramanick","doi":"10.1109/SECON.1992.202326","DOIUrl":null,"url":null,"abstract":"Presents an inherently parallel heuristic solution methodology called parallel dynamic interaction (PDI) and report its application to the flow-shop scheduling problem. Results indicate that, across the 40 examples studied, PDI solutions were on an average of within 2.5% of optimal. Additionally, the time taken for PDI to arrive at such high-quality solutions was negligible compared to that taken by conventional search techniques.<<ETX>>","PeriodicalId":230446,"journal":{"name":"Proceedings IEEE Southeastcon '92","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings IEEE Southeastcon '92","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SECON.1992.202326","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Presents an inherently parallel heuristic solution methodology called parallel dynamic interaction (PDI) and report its application to the flow-shop scheduling problem. Results indicate that, across the 40 examples studied, PDI solutions were on an average of within 2.5% of optimal. Additionally, the time taken for PDI to arrive at such high-quality solutions was negligible compared to that taken by conventional search techniques.<>