{"title":"PANDeMOO: a powerline communications access network designer based on multi-objective optimization","authors":"A. Haidine, I. Mellado, R. Lehnert","doi":"10.1109/ISPLC.2005.1430479","DOIUrl":null,"url":null,"abstract":"In this work, we investigate the problems related to the planning of the broadband powerline communications (B-PLC) access network. This design problem is subdivided into two main optimization parts; namely the generalized base station placement (GBSP) problem and the PLC channels allocation problem (CAP). These two problems are considered as multi-objective optimization problems; therefore, they are solved through different possible multi-optimization algorithms (MOA). The investigated MOAs and other required modules are implemented in a planning tool, which is designed for the planning of the B-PLC access networks and therefore it is called PANDeMOO (powerline communications access networks designer based on multi-objective optimization).","PeriodicalId":153251,"journal":{"name":"International Symposium on Power Line Communications and Its Applications, 2005.","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Power Line Communications and Its Applications, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPLC.2005.1430479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
In this work, we investigate the problems related to the planning of the broadband powerline communications (B-PLC) access network. This design problem is subdivided into two main optimization parts; namely the generalized base station placement (GBSP) problem and the PLC channels allocation problem (CAP). These two problems are considered as multi-objective optimization problems; therefore, they are solved through different possible multi-optimization algorithms (MOA). The investigated MOAs and other required modules are implemented in a planning tool, which is designed for the planning of the B-PLC access networks and therefore it is called PANDeMOO (powerline communications access networks designer based on multi-objective optimization).