Timely and efficient facilitation of coordination of software developers' activities

Kelly Blincoe
{"title":"Timely and efficient facilitation of coordination of software developers' activities","authors":"Kelly Blincoe","doi":"10.1109/ICSE.2012.6227042","DOIUrl":null,"url":null,"abstract":"Work dependencies often exist between the developers of a software project. These dependencies frequently result in a need for coordination between the involved developers. However, developers are not always aware of these Coordination Requirements. Current methods which detect the need to coordinate rely on information which is available only after development work has been completed. This does not enable developers to act on their coordination needs. Furthermore, even if developers were aware of all Coordination Requirements, they likely would be overwhelmed by the large number and would not be able to effectively follow up directly with the developers involved in each dependent task. I will investigate a more timely method to determine Coordination Requirements in a software development team as they emerge and how to focus the developers attention on the most crucial ones. Further, I hope to prove that direct inter-personal communication is not always necessary to fulfill these requirements and gain insight on how we can develop tools that encourage cheaper forms of coordination.","PeriodicalId":420187,"journal":{"name":"2012 34th International Conference on Software Engineering (ICSE)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 34th International Conference on Software Engineering (ICSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSE.2012.6227042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Work dependencies often exist between the developers of a software project. These dependencies frequently result in a need for coordination between the involved developers. However, developers are not always aware of these Coordination Requirements. Current methods which detect the need to coordinate rely on information which is available only after development work has been completed. This does not enable developers to act on their coordination needs. Furthermore, even if developers were aware of all Coordination Requirements, they likely would be overwhelmed by the large number and would not be able to effectively follow up directly with the developers involved in each dependent task. I will investigate a more timely method to determine Coordination Requirements in a software development team as they emerge and how to focus the developers attention on the most crucial ones. Further, I hope to prove that direct inter-personal communication is not always necessary to fulfill these requirements and gain insight on how we can develop tools that encourage cheaper forms of coordination.
及时有效地协调软件开发人员的活动
工作依赖关系通常存在于软件项目的开发人员之间。这些依赖关系经常导致需要在涉及的开发人员之间进行协调。然而,开发人员并不总是意识到这些协调需求。目前确定需要进行协调的方法所依赖的信息只有在发展工作完成之后才能得到。这并不使开发人员能够根据他们的协调需求进行操作。此外,即使开发人员知道所有的协调需求,他们也可能会被大量的需求所淹没,并且无法有效地直接跟踪涉及每个相关任务的开发人员。我将研究一种更及时的方法来确定软件开发团队中的协调需求,以及如何将开发人员的注意力集中在最关键的需求上。此外,我希望证明直接的人际沟通并不总是满足这些要求所必需的,并深入了解我们如何开发鼓励更便宜的协调形式的工具。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信